A full list of Exhibits which have been tendered to the Murray-Darling Basin Royal Commission can be accessed here.

The links to the Exhibits are available below. 

RCE 1 - 50

18 June, 2018

RCE1: Murray-Darling Basin Authority, 'Guide to the Proposed Basin Plan: Volume 1 – Overview' (MDBA Publication No 60/10, 2010).

RCE2: Murray-Darling Basin Authority, 'Guide to the Proposed Basin Plan: Volume 2 – Technical Background' (MDBA Publication No 61/10, 2010).

RCE3: Murray-Darling Basin Authority, ‘The Northern Basin Review’ (MDBA Publication No 39/16, November 2016).

RCE4: CSIRO, ‘A Science Review of the Implications for South Australia of the Guide to the Proposed Basin Plan: Synthesis’ (Technical Report Series, Goyder Institute for Water Research, No 11/1, 7 June 2011).

RCE5: Murray-Darling Basin Authority, ‘Sustainable Diversion Limit Adjustment Mechanism: Draft Determination Report’ (MDBA Publication No 37/17, 2 October 2017).

RCE6: Murray-Darling Basin Authority, ‘The Proposed “Environmentally Sustainable Level of Take” for Surface Water of the Murray-Darling Basin: Method and Outcomes’ (MDBA Publication No 226/11, November 2011).

RCE7: Murray-Darling Basin Authority, 'Plan for the Murray-Darling Basin – Role of Authority Chair' (Media Release, 7 December 2010).

RCE8: Murray-Darling Basin Authority, ‘Hydrologic Modelling of the Relaxation of Operational Constraints in the Southern Connected System: Methods and Results’ (MDBA Publication No 76/12, October 2012).

RCE9: W J Young et al, ‘Science Review of the Estimation of an Environmentally Sustainable Level of Take for the Murray-Darling Basin’ (Final Report to the Murray-Darling Basin Authority, CSIRO, November 2011).

RCE10: Matt Gibbs et al, ‘Science Review of MDBA Modelling of Relaxing Constraints for Basin Plan Scenarios’ (Technical Note 2012/02, Department of Environment, Water and Natural Resources (SA), September 2012).

RCE11: Legal Opinions Submitted to the Senate and Constitutional Affairs Reference Committee:

a. Paul Kildea and George Williams, Gilbert + Tobin, Centre of Public Law, Submission No 15 to Senate Legal and Constitutional Affairs References Committee, Parliament of Australia, Provisions of the Water Act 2007, March 2011.

b. Australian Network of Environmental Defender's Offices, Submission No 16 to Senate Legal and Consitutional Affairs References Committee, Parliament of Australia, Provisions of the Water Act 2007, March 2011.

c. Law Society of New South Wales, Submission No 51 to Senate Legal and Constitutional Affairs References Committee, Parliament of Australia, Provisions of the Water Act 2007, March 2011.

d. Douglas Fisher et al, Submission No 75 to Senate Legal and Constitutional Affairs References Committee, Parliament of Australia, Provisions of the Water Act 2007, March 2011.

RCE12: Submissions to Murray-Darling Basin Royal Commission in Response to Issues Paper 2:

a. Anne Jensen, Healthy Rivers Ambassadors, Submission to Murray-Darling Basin Royal Commission, 31 May 2018.

b. Michael Murray, Cotton Australia, Submission to Murray-Darling Basin Royal Commission, 2018.

c. Tom Rooney, Waterfind Australia, Submission to Murray-Darling Basin Royal Commission, 1 June 2018.

d. Barbara Webster, Submission to Murray-Darling Basin Royal Commission, 2018.

e. Warwick Ragg, National Farmers’ Federation, Submission to Murray-Darling Basin Royal Commission, 1 June 2018.

f. Hugo Hopton, Nature Foundation SA, Submission to Murray-Darling Basin Royal Commission, 30 May 2018.

g. Ken Pattison, Submission to Murray-Darling Basin Royal Commission, 2018.

h. Mary Ewing, Lachlan Valley Water, Submission to Murray-Darling Basin Royal Commission, 2018.

i. Ray Stubbs, Riverina and Murray Regional Organisation of Councils, Submission to Murray-Darling Basin Royal Commission, 2018.

j. David Pearce and Elizabeth Russell-Pearce, Submission to Murray-Darling Basin Royal Commission, 2018.

k. Julia Peacock, Nature Conservation Society, Submission to Murray-Darling Basin Royal Commission, 2018.

l. David Bell, Submission to Murray-Darling Basin Royal Commission, 2018.

m. Anita Foerster and Alex Gardner, Melbourne Law School and University of Western Australia Law School, Submission to Murray-Darling Basin Royal Commission, 2018.

n. Doug Humphreys, The Law Society of New South Wales, Submission to Murray-Darling Basin Royal Commission, 2018.  

o. Anna Hooper, Australian Vignerons, Submission to Murray-Darling Basin Royal Commission, 2018.

p. John Hunt, South Australian Dairyfarmers' Association, Submission to Murray-Darling Basin Royal Commission, 2018.   

q. Gabrielle Coupland, Southern Riverina Irrigators Association, Submission to Murray-Darling Basin Royal Commission, 2018.

r. Travis Tobin, Queensland Faermers' Association, Submission to Murray-Darling Basin Royal Commission, 2018.  

s. Will Mooney, Murray Lower Darling River Indigenous Nations, Submission to Murray-Darling Basin Royal Commission, 2018.  

t. Paul Stevens, Submission to Murray-Darling Basin Royal Commission, 2018. 

RCE13: CSIRO, ‘Water Availability in the Murray-Darling Basin: A Report to the Australian Government’ (October 2008).

RCE14:

a. Witness Statement of David Bell, 14 June 2018.

b. David Bell, Submission to Murray-Darling Basin Royal Commission, 12 June 2018 with Attachment, Todd Wallace and Darren Baldwin, '''Natural" Versus "Artificial" Watering of Floodplains and Wetlands' (Final Report to the Murray-Darling Basin Authority, The Murray-Darling Freshwater Research Centre, October 2011).

27 and 28 June, 2018 

RCE15: Witness Statement of Matthew Colloff, 21 June 2018.

RCE16: CSIRO, 'Assessment of the Ecological and Economic Benefits of Environmental Water in the Murray-Darling Basin — The Final Report to the Murray-Darling Basin Authority from the CSIRO Multiple Benefits of the Basin Plan Project’ (CSIRO Water for a Healthy Country National Research Flagship, 28 March 2012).

RCE17: CSIRO, ‘Chapter 3: Ecological Benefits — Assessment of the Ecological and Economic Benefits of Environmental Water in the Murray-Darling Basin’ (Draft Chapter, Murray-Darling Basin Authority — Multiple Benefits Project, 6 December 2011).

RCE18: Murray-Darling Basin Authority, 'Hydrologic Modelling to Inform the Proposed Basin Plan: Methods and Results' (MDBA Publication No 17/12, February 2012).

RCE19:

a. Matthew Colloff, Summary of Handwritten Notes, 14 June 2018.

b. Matthew Colloff, Handwritten Notes dated 10 January 2011–31 August 2011.

RCE20: Witness Statement of Peter Cosier, 24 June 2018.

RCE21: South Australian Government, Submission to Murray-Darling Basin Royal Commission, June 2018).

RCE22: Peter Hunt, 'Basin Plan to be Watered Down', The Weekly Times (Victoria), 6 April 2011. 

RCE23: Letter from Peter Cosier, Wentworth Group of Concerned Scientists to Craig Knowles,  Murray-Darling Basin Authority, 4 May 2011.

RCE24: Wentworth Group of Concerned Scientists, 'Proposal for an Independent Science Accreditation Panel'.

RCE25: Bill Young, Don Blackmore and Gary Jones, 'MDBA: Science Leaders Forum' (Forum Findings, May 2011).

RCE26: Matthew Colloff et al, 'Adaption Services of Floodplains and Wetlands under Transformational Climate Change' (2016) 26(4) Ecological Applications, Ecological Society of America 1003.

RCE27: R Quentin Grafton and John Williams, Submission to Murray-Darling Basin Royal Commission, 19 April 2018.

RCE28: John Williams, 'Water Reform in the Murray–Darling Basin: A Challenge in Complexity in Balancing Social, Economic and Environmental Perspectives' (2017) 150(1) Journal of the Proceedings of the Royal Society of NSW 68. 

RCE29: R Quentin Grafton et al, 'Global Insights into Water Resources, Climate Change and Governance' (25 November 2013) 3 Nature Climate Change 315.

RCE30: Jamie Pittock et al ,'The Murray–Darling Basin Plan Fails to Deal Adequately with Climate Change' [2015] Water 28.

RCE31: Quentin Grafton, ‘Editorial: Water Reform and Planning in the Murray-Darling Basin, Australia’ (2016) 3(3) Water Economics and Policy.

RCE32: Letter from Paul Morris, Department of Agriculture and Water Resources (Cth) to Ariel Dinar, University of California, 19 May 2017.

RCE33: Matthew Colloff, John Williams and Quentin Grafton, Submission No 12 to Productivity Commission, Murray-Darling Basin Plan: Five-Year Assessment, 16 April 2018.

RCE34: R Quentin Grafton and John Williams, Submission No 2 to House Standing Committee on Agriculture and Water Resources, Parliament of Australia, Inquiry into Water Use Efficiency in Australian Agriculture, 21 March 2017.

RCE35: Return-flow diagram. 

RCE36: Senate Rural and Regional Affairs and Transport References Committee, Parliament of Australia, Management of the Murray-Darling Basin - Second Interim Report: The Basin Plan (2012). 

RCE37: Commonwealth Government, 'Australian Government Response to the Senate Rural and Regional Affairs and Transport References Committee Report: Management of the Murray-Darling Basin System: Second Interim Report: the Basin Plan'  (January 2013).

RCE38: Murray-Darling Basin Authority, 'Developing the Guide to the Proposed Basin Plan: Peer Review Reports' (MDBA Publication 62/10, 2nd ed, 1 December 2010).

RCE39: Richard Kingsford, Submission to Murray-Darling Basin Royal Commission, 2018.

RCE40: Richard Kingsford, Gilad Bino and John Porter, 'Continental Impacts of Water Development on Waterbirds, Contrasting Two Australian River Basins: Global Implications for Sustainable Water Use' (2017) 23 Global Change Biology 4958.

RCE41: Celine Steinfeld and Richard Kingsford, 'Disconnecting the Floodplain: Earthworks and their Ecological Effect on a Dryland Floodplain in the Murray–Darling Basin, Australia' (2013) 29 River Research and Applications 206.

RCE42: Richard Kingsford et al, 'Strategic Adaptive Management Guidelines for Effective Conservation of Freshwater Ecosystems in and Around Protected Areas of the World' (IUCN WCPA Freshwater Taskforce: Australian Wetlands and Rivers Centre, 2012).

RCE43: Shiquan Ren and Richard Kingsford, 'Statistically Integrated Flow and Flood Modelling Compared to Hydrologically Integrated Quantity and Quality Model for Annual Flows in the Regulated Macquarie River in Arid Australia' (2011) 48 Environmental Management 177.

RCE44: Richard Kingsford and John Porter, 'Monitoring Waterbird Populations with Aerial Surveys - What Have We Learnt?' (2009) 36 Wildlife Research 29.

RCE45: Richard Kingsford, 'Ecological Impacts of Dams, Water Diversions and River Management on Floodplain Wetlands in Australia' (2000) 25 Austral Ecology 109.

RCE46: Drew Bewsher, Hugh Milner and David Harriss, 'Water Resources Investigations of Menindee Lakes, NSW' (Paper presented at Water Down Under '94, Adelaide, 21-5 November 1994) 89.

RCE47: Francis Chiew et al, 'Comparison of Runoff Modelled Using Rainfall from Different Downscaling Methods for Historical and Future Climates' (2010) 387 Journal of Hydrology 10.

RCE48: Nick Potter and Francis Chiew, 'An Investigation into Changes in Climate Characteristics Causing the Recent Very Low Runoff in the Southern Murray-Darling Basin Using Rainfall-Runoff Models' (2011) 47 Water Resources Research.

RCE49: Centre for Ecosystem Science, UNSW Sydney, 'Submission on Implementing the NSW Floodplain Harvesting Policy and Better Management of Environmental Water – Consultation Papers' (2018).

RCE50: Murray-Darling Basin Authority, 'Environmental Outcomes of the Northern Basin Review' (October 2016).

RCE 51 - 100

RCE51: Murray-Darling Basin Authority, 'MDBA Analysis: Menindee Lakes Water Saving Project Phase 2 Business Case - Proponent: NSW.

3 July, 2018

RCE52: Sarah Wheeler et al, Submission to Murray-Darling Basin’s Royal Commission, 30 April 2018.

RCE53: RMCG, 'Basin Plan – GMID Socio-Economic Impact Assessment: Final Report' (13 October 2016).

RCE54: Boyd Blackwell, Jim McFarlane and Richard Stayner, 'Final Review Report for the Murray-Darling Basin Authority: An Independent Review of Social and Economic Modelling Inputs to the Northern Basin Review' (University of New England, 12 October 2016).

RCE55: KPMG Economics, 'Northern Basin Community Modelling: Economic Assessment of Water Recovery Scenarios' (November 2016).

RCE56: Gavan Dwyer, Matthew Clarke and Rodd Carr, 'Economic Effects of the Commonwealth Water Recovery Programs in the Murrumbidgee Irrigation Area: Report Prepared for the Department of Agriculture and Water Resources' (Marsden Jacob Associates, October 2017).

RCE57: KPMG Economics, 'Southern Basin Community Modelling: Preliminary Data Analysis – Chart Pack' (February 2018).

RCE58: Murray-Darling Basin Authority, 'Northern Basin Review: Technical Overview of the Social and Economic Analysis' (MDBA Publication No 40/16, December 2016).

RCE59: Letter from Joanne Masters, Murray-Darling Basin Royal Commission to Matthew Toulmin, RMCG, 22 June 2018.

RCE60: Letter from Joanne Masters, Murray-Darling Basin Royal Commission to Laurent Cretegny and Michael Malakellis, KPMG Economics, 22 June 2018.

RCE61: R Quentin Grafton and Sarah Wheeler, 'Economics of Water Recovery in the Murray-Darling Basin' (2018) 10 Annual Review of Resource Economics 487.

RCE62: Sarah Wheeler, Alec Zuo and Henning Bjornlund, 'Investigating the Delayed On-Farm Consequences of Selling Water Entitlements in the Murray-Darling Basin' (2014) 145 Agriculture Water Management 72.

RCE63: Adam Loch et al, 'Irrigator Preferences for Water Recovery Budget Expenditure in the Murray-Darling Basin, Australia' (2014) 36 Land Use Policy 396.

RCE64: Letter from Joanne Masters, Murray-Darling Basin Royal Commission to Boyd Blackwell, University of New England, 22 June 2018.

RCE65: Letter from Joanne Masters, Murray-Darling Basin Royal Commission to Andrew Metcalfe, Ernst & Young, 22 June 2018.

5 July, 2018 

10 July, 2018

11 July, 2018 

RCE74: Wentworth Group of Concerned Scientists, Submission to Water Renewal Taskforce, Department of Primary Industries (NSW), Water Reform Action Plan, 15 April 2018.

12 July, 2018

RCE75: Michael Murray, Cotton Australia, Submission to Murray Darling Basin Royal Commission, 30 April 2018.

RCE76: Daren Barma, ‘Northern Basin Historic Flow and Usage Report’ (Barma Water Resources Pty Ltd, April 2018).

RCE77: Michael Murray, Submission to Murray Darling Basin Royal Commission in Response to Issues Paper No 2, 1 June 2018.

RCE78: Cotton Australia and Cotton Research and Development Corporation, ‘Australian Grown Cotton Sustainability Report 2014’ (2014). 

RCE79: Australian Cotton Research Institute, ‘The Australian Cotton Water Story – A Decade of Research and Development 2002-2012’ (2012)

RCE80: Cotton Australia 'Australian Cotton Production and Area' (Graph).

RCE81: Peter Austin, 'Quick Access to Flood Feed After "Willancora" Sale', The Land (Australia), 12 November 2009.

RCE82: Witness Statement of Maryanne Slattery, 11 July 2018.

RCE83: Maryanne Slattery, The Australia Institute, Submission to Murray-Darling Basin Royal Commission, July 2018.

RCE84: Murray-Darling Basin Authority, 'Murray-Darling Basin Water Resource Plan Areas - Surface Water' (Map, 2017).

17 July, 2018

RCE85: Wentworth Group of Concerned Scientists, ‘Blueprint for National Water Plan’ (Report, 31 July 2003).

RCE86: Wentworth Group of Concerned Scientists, ‘Sustainable Diversions in the Murray-Darling Basin: An Analysis of Options for Achieving a Sustainable Diversion Limit in the Murray-Darling Basin’ (Report, June 2010).

RCE87: Wentworth Group of Concerned Scientists, ‘Statement on the 2011 Draft Murray-Darling Basin Plan’ (January 2012).

RCE88: Wentworth Group of Concerned Scientists, ‘Analysis of Groundwater in the 2011 Draft Murray-Darling Basin Plan’ (April 2012).

RCE89: Wentworth Group of Concerned Scientists,  ‘Once Again the Taxpayer Pays, Individuals Benefit and the River Loses' (August 2012).

RCE90: Wentworth Group of Concerned Scientists, ‘Does a 3200GL Reduction in Extraction Combined with the Relaxation of Eight Constraints Give a Healthy Working Murray-Darling Basin River System?’ (October 2012).

RCE91: Wentworth Group of Concerned Scientists, ‘Five Actions Necessary to Deliver the Murray-Darling Basin Plan "in full and on time"' (5 June 2017).

RCE92: Wentworth Group of Concerned Scientists, ‘Review of Water Reform in the Murray-Darling Basin’ (Report, November 2017).

RCE93: Wentworth Group of Concerned Scientists, ‘Requirements of SDL Adjustment Projects to Ensure they are Consistent with the Water Act 2007, Basin Plan 2012, MDBA Policies and Intergovernmental Agreements’ (6 May 2018).

RCE94: Wentworth Group of Concerned Scientists, ‘Advice on Basin Plan Amendment Instrument 2017 (No 1)’ (January 2018).

RCE95: Wentworth Group of Concerned Scientists, Submission to Murray-Darling Basin Authority, Proposed Amendments to the Murray-Darling Basin Plan, 24 February 2017.

RCE96: Letter from Peter Cosier, Wentworth Group of Concerned Scientists to Murray-Darling Basin Authority, 3 November 2017.

RCE97: Witness Statement of Alan Whyte, 16 July 2018. 

RCE98: South West Water Users, 'Items for Discussion at New South Wales Irrigators’ Council' (7 February 2018).

RCE99: Alan Whyte, 'A Report of Meetings with NSW Irrigators' Council 28 February to 3 March 2017' (Draft, 6 March 2017).

RCE100: Lower Darling Horticulture Group, Submission to Murray-Darling Basin Royal Commission,  21 March 2018. 

RCE 101 - 150

RCE101: Witness Statement of Rachel Strachan, 13 July 2018.

18 July, 2018

RCE102: Murray-Darling Basin Authority, ‘Basin Plan Water Resource Plan Requirements: Position Statement 1B – Interpreting “have regard to’’’ (MDBA Reference D15/15007, 23 March 2017).

RCE103: Northern Basin Aboriginal Nations, Submission to Murray-Darling Basin Royal Commission, 17 May 2018.

RCE104: Monica Morgan, Lisa Strelein and Jessica Weir, ‘Indigenous Rights to Water in the Murray-Darling Basin: In support of the Indigenous Final Report to the Living Murray Initiative’ (Research Discussion Paper No 14, AIATSIS, 2004).

RCE105: Monica Morgan, 'Cultural Flows: Asserting Indigenous Rights and Interests in the Waters of the Murray-Darling River System, Australia' in B R Johnston et al (eds), Water, Cultural Diversity, and Global Environmental Change Emerging Trends, Sustainable Futures? (United Nations Educational, Scientific and Cultural Organisation, 2012) 453.

RCE106: National Irrigators’ Council, Submission to Murray-Darling Basin Royal Commission, April 2018

RCE107: Steve Whan, National Irrigators’ Council, Submission No 15 to Productivity Commission, Murray-Darling Basin: Five-Year Assessment, April 2018.

RCE108: Steve Whan, National Irrigators’ Council, Submission No 31 to Senate Rural and Regional Affairs Committee, Parliament of Australia, Inquiry on the Murray-Darling Basin, September 2017.

RCE109: Steve Whan, National Irrigators’ Council, Submission No 13 to House of Representatives Standing Committee, Parliament of Australia, Inquiry into Water Use Efficiency in Australian Agriculture, March 2017.

RCE110: Steve Whan, National Irrigators’ Council, Submission No 13 to Productivity Commission, National Water Reform, April 2017.

19 July, 2018 

RCE111: Fred Hooper, Northern Basin Aboriginal Nations, Submission No 201 to Murray-Darling Basin Authority, Proposed Basin Plan Amendments.

RCE112: Cheryl Buchanan, Northern Basin Aboriginal Nations, Submission to Department of Agriculture and Water Resources (Cth), Independent Review of the Water Act 2007, 30 July 2014.

RCE113: Peter Peterson, Northern Basin Aboriginal Nations, Submission to Natural Resources Commission and Office of Water (NSW), NRC Water Sharing Plan Review, 4 February 2013.

RCE114: Northern Basin Aboriginal Nations, Suggestions for Legislative Amendment to Water Act 2007.

RCE115: Email from Will Mooney, Murray Lower Darling Rivers Indigenous Nations to Monica Morgan, Yorta Yorta Nation Aboriginal Corporation, 24 October 2017.

RCE116: Email from Maxine Kerr, Murray-Darling Basin Authority to Monica Morgan, Yorta Yorta Nation Aboriginal Corporation, 12 September 2017.

RCE117: Goulburn Broken Catchment Management Authority, 'Yorta Yorta Nation' (Map).

RCE118: Murray-Darling Basin Commission, ‘Memorandum of Understanding between Murray Lower Darling Rivers Indigenous Nations and Murray-Darling Basin Commission’ (23 March 2006).

RCE119: National Cultural Flows Research Project, ‘Dhungala Baaka: Rethinking the Future of Water Management in Australia’ (Report, 2017).

RCE120: National Cultural Flows Research Project, ‘Cultural Flows: A Guide for First Nations’ (Report, 2017).

RCE121: National Cultural Flows Research Project, ‘A Pathway to Cultural Flows in Australia’ (Report, 2018).

RCE122: Commonwealth Government, 'Government Offer'.

RCE123: Murray Lower Darling Rivers Indigenous Nations, 'Ensuring Equity in the Development and Assessment of Water Resource Plans' (Discussion Paper, April 2016).

RCE124: Witness Statement of David Harriss, 18 July 2018.

RCE125: Murray Lower Darling Rivers Indigenous Nations, Submission to Murray-Darling Basin Royal Commission, 7 June 2018.

RCE126: Murray Lower Darling Rivers Indigenous Nations, Supplementary Submission to Murray-Darling Basin Royal Commission, 16 July 2018.

RCE127: Murray Lower Darling Rivers Indigenous Nations, Submission to Murray-Darling Basin Authority, Proposed Basin Plan Amendments, 24 February 2017.

RCE128: Murray Lower Darling Rivers Indigenous Nations, Submission to Murray-Darling Basin Authority, Sustainable Diversion Limit Adjustment Mechanism Draft Determination.

RCE129: Murray Lower Darling Rivers Indigenous Nations, ‘Cultural Flows and Aboriginal Environmental Outcomes’ (Briefing Paper).

24 July, 2018 

RCE130: Bewsher Consulting Pty Ltd, 'Review of the Hydrological Modelling Frameworks used to Inform Potential Basin Plan Amendments' (Final Report, Murray-Darling Basin Authority, September 2016).

RCE131: Bewsher Consulting Pty Ltd, ‘Independent Review of Hydrologic Modelling for SDL Adjustments’ (Final Report, Murray-Darling Basin Authority, 30 September 2017).

RCE132: Witness Statement of John Clements, 23 July 2018.

RCE133: Northern Basin Advisory Committee, ‘Finding the Balance: Final Report of the Northern Basin Advisory Committee’ (9 October 2016).

RCE134: Emma Bradbury, Murray-Darling Association, Submission to Murray-Darling Basin Royal Commission, 27 April 2018.

RCE135: Emma Bradbury, Murray-Darling Association, Submission to Murray-Darling Basin Authority, Sustainable Diversion Limit Adjustment Mechanism, 3 November 2017.

RCE136: Murray-Darling Association, 'Report on the Social and Economic Impacts of the Basin Plan Local Government Data Collection Project' (2015).

25 July, 2018 

RCE137: Bewsher Consulting Pty Ltd, ‘Barwon-Darling Valley Independent Audit of Cap Model’  (Final Report, Murray-Darling Basin Authority, January 2013).

RCE138: William Johnson, Submission to Murray-Darling Basin Royal Commission, 30 April 2018.

RCE139: Witness Statement of William Johnson, 24 July 2018.

RCE140: Ken Matthews, 'Independent Investigation into NSW Water Management and Compliance' (Interim Report, Department of Industry (NSW), 8 September 2017).

RCE141: Ken Matthews, 'Independent Investigation into NSW Water Management and Compliance - Advice on Implementation' (Final Report, Department of Industry (NSW), 24 November 2017).

RCE142: William Johnson, Water Reform Action Plan Meeting Notes, 16 March 2018.

RCE143: Office of Environment and Heritage (NSW), 'Native fish of the Darling River- Managing Water for Fsh and Connectivity' (May 2017).

RCE144: Martin Mallen-Cooper, Submission to Murray-Darling Royal Commission, 30 April 2018.

RCE145: Martin Mallen-Cooper and Brenton Zampatti, ‘History, Hydrology and Hydraulics: Rethinking the Ecological Management of Large Rivers’ (2018) 11(5)  Ecohydrology 1.

RCE146: Martin Mallen-Cooper and Brenton Zampatti, ‘Background Paper: Use of Life History Conceptual Models of Fish in Flow Management in the Murray-Darling Basin’ (Report to the Murray-Darling Basin Authority, February 2015).

RCE147: Martin Mallen-Cooper and Brenton Zampatti, ‘Background Paper: Rethinking the Natural Flow Paradigm in the Murray-Darling Basin’ (Report to the Murray-Darling Basin Authority, February 2015).

RCE148: Martin Mallen-Cooper et al, ‘Managing the Chowilla Creek Environmental Regulator for Fish Species at Risk’ (Report to the South Australian Murray-Darling Basin Natural Resources Management Board, January 2011).

RCE149: Ian Overton et al, ‘Development of the Murray-Darling Basin Plan SDL Adjustment Ecological Elements Method’ (Report to the Murray-Darling Basin Authority, 2014).

RCE150: Brenton Zampatti et al, ‘Reproduction and Recruitment of Golden Perch (Macquaria ambigua ambigua) in the Southern Murray-Darling Basin in 2013-2014: An Exploration of River-Scale Response, Connectivity and Population Dynamics’ (SARDI Research Report Series No 820, Publication No F2014/000756-1, SARDI PIRSA, February 2015).

RCE 151 - 201
RCE151: Brenton Zampatti, Project E.1.15 - Science to Inform Artificial Floodplain Inundation: Movement and Habitat Use of Murray Cod During Testing of the Chowilla Creek regulator, Goyder Institute for Water Research, Environmental Water 2018 <http://www.goyderinstitute.org/projects/view-project/32>.

RCE152: K Holland et al, ‘Floodplain Response and Recovery: Comparison Between Natural and Artificial Floods’ (Technical Report Series 13/4, Goyder Institute for Water Research, 2013).

RCE153: Brenton Zampatti, Chris Bice and Phillipa Wilson, ‘Can Further Regulation of the River Murray be Used to Promote Ecosystem Health? A Fish Ecology Perspective’ (Abstract of presentation to Australian Society for Limnology Conference 2016) 16.

26 July, 2018

RCE154: Minute from Director, Cap Transition, Murray-Darling Basin Authority to Chief Executive, Murray-Darling Basin Authority, 17 February 2014.

RCE155: Curriculum Vitae of R Quentin Grafton.

RCE156: Barwon-Darling Water, Submission to Murray-Darling Basin Royal Commission, May 2018.

RCE157: Barwon-Darling Water, 'Barwon-Darling 101- Understanding the Unregulated Barwon-Darling River and its Water Users' (9 January 2018).

RCE158: Anna Bailey, Department of Primary Industries (NSW), ‘Proposed Shepherding Arrangements for Environmental Water in NSW’ (PowerPoint Presentation, May/June 2012).

RCE159: Bundle of Correspondence between Ian Cole and the New South Wales Government Regarding Metering (Various Dates).

RCE160: Letter from David Harris, Department of Water & Energy (NSW) to Fort Bourke Pty Ltd, 25 June 2007.

30 July, 2018 

31 July, 2018 

RCE164: Department of Primary Industries (NSW), 'Pre-Requisite Policy Measure Implementation Plan' (June 2017).

RCE165: Murray-Darling Basin Authority, ‘Pre-Requisite Policy Measures Assessment Guidelines Final’ (9 April 2015).

RCE166: Qiang Jiang and R Quentin Grafton, ‘Economic Effects of Climate Change in the Murray-Darling Basin, Australia’ (2012) 110 Agricultural Systems 10.

RCE167: R Quentin Grafton, ‘How to Increase the Cost-Effectiveness of Water Reform and Environmental Flows in the Murray-Darling Basin’ (2010) 17(2) Agenda 17.

RCE168: R Quentin Grafton and John Williams, ‘Comments on Draft Report by Productivity Commission on National Water Reform: An Inquiry into Progress with the Reform of Australia’s Water Resources Sector’ (Crawford School of Public Policy, Australian National University, 18 October 2017).

RCE169: David Adamson and Adam Loch, ‘Achieving Environmental Flows where Buyback is Constrained’ (2018) 62 Australian Journal of Agricultural and Resource Economics 83.

RCE170: David Adamson, Adam Loch and Kurt Schwabe, ‘Adaptation Responses to Increasing Drought Frequency’ (2017) 61 Australian Journal of Agricultural and Resource Economics 385.

RCE171: David Adamson and Adam Loch, ‘Possible Negative Feedbacks from “Gold-Plating” Irrigation Infrastructure’ (2014) 145 Agricultural Water Management 134.

RCE172: Adam Loch et al, ‘Irrigator Preferences for Water Recovery Budget Expenditure in the Murray-Darling Basin’ (2014) 36 Land Use Policy 396.

RCE173: David Adamson et al, Submission No 19 to House of Representatives Standing Committee on Agriculture and Water Resources, Parliament of Australia, Inquiry into Water Use Efficiency in Australian Agriculture, 2017.

RCE174: Email from Peter Hyde, Department of Primary Industries (NSW) to Roderick Campbell, The Australia Institute and Carl Binning, Murray-Darling Basin Authority, 14 June 2018.

RCE175: Email from Roderick Campbell, The Australia Institute to Carl Binning, Murray-Darling Basin Authority and Peter Hyde, Department of Primary Industries (NSW), 4 June 2018.

RCE176: Maryanne Slattery, 'Flows at Bourke: Actual and Modelled Flows and the Cumulative Difference Between Actual and Modelled Flows (ML)' and 'Comparison of Cumulative Cap Credits (GL); and the Cumulative Difference of Modelled and Observed Flows at Bourke (ML)' (Graphs).

RCE177: Maryanne Slattery and Roderick Campbell, 'Remember the ’56 Flood? How Much Water Flows to the Environment in the Barwon Darling System?' (Publication No 462, The Australia Institute, December 2017).

RCE178: Maryanne Slattery and Roderick Campbell, 'Northern Disclosure: Inconsistencies in the Murray Darling Basin Authority’s Northern Basin Review' (Publication No 479, The Australia Institute, February 2018).

RCE179: Maryanne Slattery and Roderick Campbell, 'It’s Not the Science, It’s How You Use It…’ (Publication No 483, The Australia Institute, February 2018).

RCE180: Maryanne Slattery and Roderick Campbell, 'Moving Targets: Barnaby Joyce, Warrego Valley Buybacks and Amendments to the Murray Darling Basin Plan' (Publication No 495, The Australia Institute, February 2018).

RCE181: Maryanne Slattery and Roderick Campbell,'That’s Not How You Haggle: Commonwealth Water Purchasing in the Condamine Balonne' (Publication No 502, The Australia Institute, March 2018).

RCE182: Maryanne Slattery and Roderick Campbell, 'Desperate Measures: Supply Measures, Diversion Limits and the Murray-Darling Basin Plan' (Publication No 514, The Australia Institute, April 2018).

RCE183: Maryanne Slattery and Roderick Campbell, 'The Basin Files – Maladministration of the Murray-Darling Basin Plan: Volume 1' (Publication No 531, The Australia Institute, June 2018).

RCE184: Maryanne Slattery and Roderick Campbell, The Australia Institute, Submission to Department of Industry (NSW), Proposed Amendments to Cap Factors for Water Recovery Accounting in New South Wales, July 2018.

RCE185: Murray-Darling Basin Authority, ‘Barwon Darling Cap Model Discussion Between NSW Government and MDBA’ (Meeting Notes, 2015).

RCE186: Murray-Darling Basin Authority, ‘Barwon Darling Cap Model Discussion Between NSW Government and MDBA’ (Meeting Minutes, 18 March 2015).

RCE187: Murray-Darling Basin Authority, ‘The Northern Basin Review: Understanding the Economic, Social and Environmental Outcomes from Water Recovery in the Northern Basin’ (Draft - Embargoed Version, 8 November 2016).

RCE188: Email from Rebecca Thornberry, Murray-Darling Basin Authority to Russell James, Murray-Darling Basin Authority, 15 November 2016.

RCE189: Murray-Darling Basin Authority, 'The Northern Basin Review: Understanding the Economic, Social and Environmental Outcomes from Water Recovery in the Northern Basin’ (Draft - Embargoed Version, 15 November 2016).

RCE190: Murray-Darling Basin Authority, 'Basin Plan Water Resource Plan Requirements' (Position Statements 1H, 4A - 4E, 6B and 6C, 2016-17):

a. Murray-Darling Basin Authority, 'Basin Plan Water Resource Plan Requirements: Position Statement 1H: Potential Reliability Changes' (MDBA Reference No D15/62870, 6 September 2016).

b. Murray-Darling Basin Authority, 'Basin Plan Water Resource Plan Requirements: Position Statement 4A: Consistency with s 10.17 on Priority Environmental Assets and Priority Ecosystem Functions' (MDBA Reference No D16/37790, 26 July 2017).

c. Murray-Darling Basin Authority, 'Basin Plan Water Resource Plan Requirements: Position Statement 4B: Consistency with 10.18 (Priority Environmental Assets Dependent on Groundwater)' (MDBA Reference No D15/86599, 3 May 2016).

d. Murray-Darling Basin Authority, 'Basin Plan Water Resource Plan Requirements: Position Statement 4C: Consistency with 10.19 (Groundwater and Surface Water Connections)' (MDBA Reference No D15/86603, 3 May 2016).

e. Murray-Darling Basin Authority, 'Basin Plan Water Resource Plan Requirements: Position Statement 4D: Consistency with 10.20 (Productive Base of Groundwater)' (MDBA Reference No D15/86604, 3 May 2016).

f. Murray-Darling Basin Authority, 'Basin Plan Water Resource Plan Requirements: Position Statement 4E: Consistency with 10.21 (Environmental Outcomes Relating to Groundwater)' (MDBA Reference No D15/86605, 3 May 2016). 

g. Murray-Darling Basin Authority, 'Basin Plan Water Resource Plan Requirements: Position Statement 6B: Consistency with Planning for Environmental Watering' (MDBA Reference No D15/6744, 2 May 2017).

h. Murray-Darling Basin Authority, 'Basin Plan Water Resource Plan Requirements: Position Statement 6C: Enabling Environmental Watering Between Connected Water Resources' (MDBA Reference No D15/79350, 2 May 2017).

RCE191: Brett Tucker, Peter Davies and Graeme Turner, ‘SDL Adjustment Mechanism Process Review’ (May 2018).

RCE192: Geoff Podger et al, ‘River System Modelling for the Basin Plan Assessment of Fitness for Purpose’ (CSIRO Water for a Healthy Country National Research Flagships, December 2010).

RCE193: Department of Industry (NSW), ‘Water Reform Technical Report: Derivation of LTDLE Factors in NSW’ (Technical Report INT18/88546, May 2018).

2 August, 2018 

RCE194: Ngarrindjeri Regional Authority Inc, Submission to Murray-Darling Basin Royal Commission, 9 May 2018.

RCE195: Ngarrindjeri Regional Authority Inc, Submission to Murray-Darling Basin Authoirty, Proposed Basin Plan, 16 April 2012.

RCE196: Sumner v State of South Australia (Ngarrindjeri Native Title Claim Part A) (National Native Title Tribunal, Extract from Native Title Register, Federal Court No SAD6027/1998, NNTT No SCD2017/002, 14 December 2007)

RCE197: Jim Birckhead et al, ‘Economic and Cultural Values of Water to the Ngarrindjeri People of the Lower Lakes, Coorong and Murray Mouth' (Report to the CSIRO, August 2011).

RCE198: Department of Environment, Water and Natural Resources (SA), 'Murray Futures: Coorong, Lower Lakes and Murray Mouth Recovery Project - South East Flows Restoration Project Sustainable Diversion Limit Adjustment Supply Measure Phase 2 Submission'.

RCE199: Murray-Darling Basin Authority, 'MDBA Advice on the South East Flows Restoration Project Business Case - Proponent: South Australia'.

RCE200: Department of Environment, Water and Natural Resources (SA) and Ngarrindjeri Regional Authority Inc, 'Water Resource Planning (Murray-Darling Basin Plan): Statement of Commitment between the Ngarrindjeri Regional Authority Incorporated and the Department of Environment, Water and Natural Resources, South Australian Murray-Darling Basin Natural Resources Management Board, South East Natural Resources Management Board' (Version 1.0, 31 July 2015).

RCE201: South Australian Murray-Darling Basin Natural Resources Management Board, 'Draft Water Allocation Plan for the River Murray Prescribed Watercourse' (Draft Version 1.1, 13 July 2018).

RCE 202 - 250

RCE202: Department of Primary Industries (NSW), ‘Securing NSW’s Water Future: NSW Government Approach to Menindee Lakes’ (March 2017).

RCE203: Robert and Katharine McBride, Submission to Murray-Darling Basin Royal Commission, 7 May 2018.

RCE204: Robert and Katharine McBride, Submission No 152 to Department of Industry (NSW), NSW Water Reform Action Plan, 15 April 2018.

RCE205: Robert and Katharine McBride, Submission No 78 to the Productivity Commission, Murray-Darling Basin Plan: Five-Year Assessment .

RCE206: Robert and Katharine McBride, Submission No 14 to Rural and Regional Affairs and Transport References Committee, Inquiry into the Integrity of the Water Market in the Murray-Darling Basin, September 2017.

RCE207: Robert McBride, Submission to Murray-Darling Basin Authority, Proposed Basin Plan Amendments, 23 February 2017.

RCE208: Minutes of Lower Darling Stakeholder Meeting (Teleconference, 9 April 2018).

RCE209: Minutes of Lower Darling Stakeholder Meeting (Teleconference, 1 March 2018).

RCE210: Minutes of Lower Darling Stakeholder Meeting (Teleconference, 4 January 2018).

RCE211: Minutes of Lower Darling Stakeholder Meeting (Teleconference, 7 December 2017).

RCE212: Minutes of Lower Darling Stakeholder Meeting (Teleconference, 5 October 2017).

RCE213: Department of Industry (NSW), ‘Lower Darling Options Analysis Stakeholder Brief’ (INT18120035, 14–15 August 2018).

RCE214: Email from Mitchell Isaacs, Department of Industry (NSW) to Katharine McBride, 7 August 2018 .

RCE215: Letter from David Littleproud, Minister for Agriculture and Water Resources (Cth) to Robert McBride, 19 June 2018.

RCE216: Letter from Community Group to Niall Blair, Minister for Regional Water (NSW), 11 May 2018.

RCE217: Letter from Robert and Katharine McBride to Water Reform Task Force, Department of Industry (NSW), 15 April 2018.

RCE218: Letter from Robert and Katharine McBride to Water Reform Task Force, Department of Industry (NSW), 15 April 2018.

RCE219: Letter from Robert and Katharine McBride to Water Reform Task Force, Department of Industry (NSW), 15 April 2018.

RCE220: Louise Burge, Submission to Murray-Darling Basin Royal Commission, 2018.

RCE221: Murray Valley Private Diverters Inc, Submission No 69 to Productivity Commission, Murray-Darling Basin Plan: Five-Year Assessment, April 2018.

RCE222: Department of Primary Industries (NSW), 'Constraints Management Strategy: Yarrawonga to Wakool Junction Reach Constraints Measure' (Concept Proposal Business Case, October 2016)

RCE223: Murray-Darling Basin Authority, ‘Constraints Management Strategy 2013 to 2024’ (MDBA OPublication No 28/13, 2013).

RCE224: Murray-Darling Basin Authority, ‘Constraints Management Strategy Annual Progress Report 2013-2014’ (December 2014).

RCE225: Murray-Darling Basin Authority, ‘Constraints Management Strategy Annual Progress Report 2015’ (MDBA Publication No 34/15, May 2016).

23-24 August, 2018 

RCE226: Witness Statement of Mal Peters, 16 August 2018.

RCE227: Questions from Edward Fessey to Peter Derham, Murray-Darling Basin Authority.

RCE228: Witness Statement of Geoffrey Wise, 21 August 2018.

RCE229: Martin C Toms et al, 'Scientific Panel Assessment of Environmental Flows for the Barwon-Darling River' (Report to the Technical Services Division of the Department of Land and Water Conservation (NSW), May 1996).

28 August, 2018 

RCE230: Mal Peters, Submission No 3667 to Murray-Darling Basin Authority, Proposed Basin Plan Amendments.

RCE231: Murray-Darling Basin Authority, Response to Mal Peters' Submission No 367 to the Murray-Darling Basin Authority, Proposed Basin Plan Amendments.

RCE232: Geoff Wise, Submission to Murray-Darling Basin Royal Commission, 27 May 2018.

RCE233: The Council of the Shire of Bourke, ‘Darling River Flow Comparisons at Bourke' (Information Sheet, 22 June 2012).

RCE234: Bundle of documents provided by Geoff Wise, ‘The Murray-Darling Basin at a Glance’ (Map Marked by G Wise); ‘Why we Needed to Take a Closer Look at the Northern Basin’ (Draft Northern Basin Review Report, Embargoed on 22 November 2016).

RCE235: Geoff Wise, ‘Understanding the Unregulated Darling River Catchment - Why Use of Modelling Extractions for Annual Compliance is Inappropriate’ (PowerPoint Presentation Delivered at Northern Basin Advisory Committee Meeting on 8-9 April 2013, marked by G Wise)

RCE236: Chris Bagley, Submission to Murray-Darling Basin Royal Commission, 24 April 2018.

RCE237: Murray-Darling Basin Authority, ‘Fact Sheet: All About the Barrages’ (MDBA Publication No. 24/11, 2011).

RCE238: Murray-Darling Basin Ministerial Council, ‘The Salinity Audit of the Murray-Darling Basin: A 100-year Perspective' (1999).

RCE239: Mark McKenzie, NSW Irrigators’ Council, Submission to Murray-Darling Basin Royal Commission, May 2018.

RCE240: Mark McKenzie, NSW Irrigators’ Council, 'Submission No 80 to Productivity Commission, Murray-Darling Basin Plan: Five -Year Assessment, 3 May 2018.

RCE241: Terry Korn, Australian Floodplain Association, Submission to Murray-Darling Royal Commission, 13 April 2018.

RCE242: Barwon-Darling Stakeholder Advisory Panel, 'Minutes: Barwon Darling Stakeholder Advisory Panel Meeting' (Meeting No 5, 10 April 2018).

RCE243: Barwon-Darling Stakeholder Advisory Panel, 'Minutes: Barwon Darling Watercourse Stakeholder Advisory Panel (SAP) Meeting' (Meeting No 6, 19 June 2018).

RCE244: Department of Industry (NSW), 'Water Resource Planning - Barwon-Darling: Protection of First Flush Flows at Wilcannia' (Model Scenario Report, INT18/10682, April 2018).

RCE245: Department of Industry (NSW), 'Water Resource Planning - Barwon-Darling: Water Sharing Plan First Flush Rule Assessment' (Model Scenario Report, June 2018).

RCE246: Witness Statement of William Brian Bates, 2018.

RCE247: Barkandji Traditional Owners Native Title Claim Group, 'Statement from Barkandji Native Title Holders on Darling River' (26 July 2017).

RCE248: Barkandji Traditional Owners #8 v Attorney-General of New South Wales (National Native Title Tribunal, Extract from Native Title Register, Federal Court No. NDS6084/1998, NNTT No. NCD2015/001, 16 June 2015).

RCE249: National Native Title Tribunal, ‘Barkandji Traditional Owners #8: Schedule 2 - Plan of Determination Area’ (NCD2015/001), 16 June 2015.

RCE250: Statement Endorsed by Barkandji Native Title Corp, 23 August 2018.

RCE 251 - 300
RCE251: Juliet Le Feuvre, Environment Victoria, Submission to Murray-Darling Basin Royal Commission, 30 April 2018.

RCE252: Environment Victoria, ‘What Does the Draft Basin Plan Mean for Northern Victoria’s Rivers? An Analysis by Environment Victoria’.

RCE253: Neville D Crossman et al, ‘Reconfiguring an Irrigation Landscape to Improve Provision of Ecosystem Services’ (2010) 69(5) Ecological Economics 1031.

29 August, 2018 

RCE254: Jan Beer, Submission to Murray-Darling Basin Royal Commission, 2018.

RCE255: Ken Jury, '“A Better Way” for the Murray Darling Basin' (6 May 2016).

RCE256: Jan Beer, ‘Statement Regarding the Proposed Creation of Easements over Private Property in Relation to the Murray Darling Basin Plan Constraints Management Strategy’ (Upper Goulburn River Catchment Association, 15 September 2015).

RCE257: Goulburn Broken Catchment Management Authority, ‘Goulburn River Constraints Proposal Open House Meetings’ (PowerPoint presentation, January 2016).

RCE258: Joe Lane, ‘Constraints Management Strategy: Costs and Benefits for Private Agricultural Land – Goulburn River’ (PowerPoint Presentation, January 2016).

RCE259: Email from Jan Beer to Christopher Kwong, Murray-Darling Basin Royal Commission, 21 August 2018 and 

Attachment
Jan Beer, ‘Flooding Impacts in the Upper Goulburn River Catchment’ (PowerPoint Presentation, 2010).

RCE260: Department of Environment, Land, Water and Planning (Vic), 'Goulburn Constraints Measure Business Case – Phase 2 Investigations' (2016).

RCE261: Witness Statement of Karlene Maywald, 28 August 2018.

30 August, 2018

RCE262: Garry Hall, Macquarie Marshes Environmental Landholders Association, Submission to Murray-Darling Basin Royal Commission, 2018.

RCE263: Macquarie Marshes Environmental Landholders Association, ‘Beef Productivity of the Macquarie Marshes' (Productivity Report, 2015).

RCE264: Bells Bridge Heights Hydstra Data Document (Provided by Dugald Bucknell). 

RCE265: Macquarie Marshes Environmental Landholders Association, Submission Regarding Proposed Changes to Cap Factors.

RCE266: Macquarie Marshes Environmental Landholders Association, Submission to Productivity Commission, Murray-Darling Basin Plan Five-Year Assessment, 26 April 2018.

RCE267: Macquarie Marshes Environmental Landholders Association, Submission to Murray-Darling Basin Authority, Proposed Basin Plan Amendments, February 2017

RCE268: Murray-Darling Basin Authority, ‘Hydrologic Modelling for the Northern Basin Review’ (MDBA Publication No 36/16, January 2016).

4-5 September, 2018 

RCE269: National Water Commission, 'National Water Commission Annual Report 2014–15' (2015).

RCE270: National Water Commission, 'The National Water Planning Report Card 2013' (2014).

RCE271: Karlene Maywald, National Water Commission,‘Reflections on the New Role of the National Water Commission’ (Powerpoint Presentation, Water Law & Policy Conference, 7 December 2012).

RCE272: Nature Foundation SA, Submission No 22 to Standing Committee on the Environment and Energy, Parliament of Australia, Inquiry into the Management and Use of Commonwealth Environmental Water, 12 April 2018.

RCE273: Nature Foundation SA, Submission to Murray-Darling Basin Authority, Inquiry into the Proposed Basin Plan Amendments, 23 February 2017.

RCE274: Anne Jensen, Healthy Rivers Ambassadors, Submission to Murray-Darling Basin Royal Commission, 29 April 2018.

RCE275: Anne Jensen, Healthy Rivers Ambassadors,  Attachments to Submission to Murray-Darling Basin Royal Commission, 29 April 2018:

a. Environmental Watering Makes a Difference (Graph); 

b. Germinants at a Site on the Murray Valley Floodplain (Image);

c. Coordinated CEWO Flows Across Seven Catchments (Map);

d. Waterbird Populations Are Showing Serious Continuing Decline (Graph);

e. Summary of Emerging Science Indicating the Critical Importance of the Lower Darling River for All Native Fish Species in the Basin (Summary).

RCE276: Letter from Anne Jensen to Malcolm Turnbull, Prime Minister of Australia, 28 August 2016.

RCE277: Letter from Barnaby Joyce, Minister for Agriculture and Water Resources (Cth) to Anne Jensen, 11 October 2016.

RCE278: Letter from Anne Jensen to Malcolm Turnbull, Prime Minister of Australia, 2 April 2017.

RCE279: Letter from Malcolm Turnbull, Prime Minister of Australia to Anne Jensen.

RCE280: Letter from Anne Jensen to Malcolm Turnbull, Prime Minister of Australia, 24 May 2017.

RCE281: Letter from Barnaby Joyce, Minister for Agriculture and Water Resources to Anne Jensen,16 June 2017.

RCE282: Documents provided by Anne Jensen:

a. 'Basin-Wide environmental watering strategy'.

b. Murray-Darling Basin Authority, Changing conditions make 2018-19 a challenging Water yYear (5 April 2018) <https://www.mdba.gov.au/media/mr/changing-conditions-make-2018-19-challenging-water-year>.

c. Murray-Darling Basin Authority, Lower Lakes, Coorong and Murray Mouth <https://www.mdba.gov.au/managing-water/environmental-water/delivering-environmental-water/lower-lakes-coorong-murray-mouth>. 

d. 'Condition fo Mature Black Box at SA Murray Valley Floodplain Sites' (Graph).   

e. 'Basin-Wide Environmental Watering Strategy'.

f. 'Summary of Surface Water Recovery Process'.

RCE283: Documents provided by Anne Jensen:        

a. Anne Jensen et al, ‘The Effect of Drainage on Groundwater Behaviour in Counties Cardwell and Buckingham and the Effect on the Coorong’ (Report for the Minister of Water Resources 1981-83).                                                                           

b. Anne Jensen et al, 'Cardwell Buckingham Recommendations' (1983).

RCE284: Anne  Jensen and Keith Walker, ‘Sustaining Recovery in Red Gum, Black Box and Lignum in the Murray River Valley: Clues from Natural Phenological Cycles to Guide Environmental Watering’ (2017) 141(2) Transactions of the Royal Society of South Australia .

RCE285: Nature Foundation SA, ‘Water for Nature: Five Year Environmental Watering Strategy – South Australian River Murray 2017-2022’.

RCE286: Anne Jensen, ‘Delivery of Environmental Water by Water For Nature Program in the South Australian River Murray Valley 2013-16’ (Report, Nature Foundation SA, October 2016).

RCE287: Anne Jensen, 'Briefing by Goyder Institute Scientists' (Briefing Notes, 16 December 2016).

RCE288: Anne Jensen, Notes of Murray-Darling Basin Authority Briefing for South Australian Conservation Groups, 23 August 2017.

RCE289: Ben Dyer, 'Murray-Darling Basin Authority Briefing for South Australian Conservation Groups, Ecological Elements' (PowerPoint Presentation, 23 August 2017).

RCE290: Todd Wallace et al, ‘Science to Inform Operational Decisions of Major Environmental Infrastructure on the Chowilla Floodplain and Other Regulated Floodplains in the SA River Murray’ (Technical Report Series No 15/18, Goyder Institute for Water Research, 2015).  

RCE291:  Leigh Thwaites and Josh Fredberg, ‘The Response Patterns of Wetland Fish Communities Following Prolonged Drought and Widespread Flooding’ (Technical Report Series No 14/9, Goyder Institute for Water Research, 2014). 

RCE292: Qifeng Ye et al, ‘Ecological Responses to Flooding in the Lower River Murray Following an Extended Drought’ (Technical Report Series No 14/6, Goyder Institute for Water Research, 2014). 

RCE293: Todd Wallace et al, ‘River Murray Channel Environmental Water Requirements: Ecological Objectives and Targets’ (Technical Report Series No 14/4, Goyder Institute for Water Research, 2014).

RCE294: Murray-Darling Basin Authority, 'Icon Site Condition: The Living Murray' (MDBA Publication No 06/18, May 2018). 

RCE295: Justin Brookes et al, ‘SDL Adjustment Ecological Elements Method Development Report: Review of Final Project Report’ (Independent Review Panel Report for the MDBA, 30 March 2014).

RCE296: Peter Davies et al, ‘Murray-Darling Basin Plan SDL Limits of Change Review’ (Independent Expert Advisory Panel Report for the MDBA, September 2017).

RCE297: R Quentin Grafton et al, ‘The Paradox of Irrigation Efficiency: Higher Efficiency Rarely Reduces Water Consumption’ (2018) 361 (6404) Science 748.

RCE298: Chris Perry, ‘Improving Irrigation Management in Conditions of Scarcity: Myth vs Truth’ (Global Water Forum, 22 May 2018). 

RCE299: Chris Perry, ‘Accounting for Water Use: Terminology and Implications for Saving Water and Increasing Production’ (2011) 98(12) Agricultural Water Management 1840.

RCE300: Chris Perry et al, ‘Increasing Productivity in Irrigated Agriculture: Agronomic Constraints and Hydrological Realities’ (2009) 96(11) Agricultural Water Management 1517.

RCE 301 - 352
RCE301: Chris Perry, ‘Efficient Irrigation: Inefficient Communication; Flawed Recommendations’ (2007) 56(4) Irrigation and Drainage 367.

RCE302: Chris Perry, Notes for Discussion, 24 August 2018.

RCE303: Chris Perry, Pasquale Steduto and Fawzi Karajeh, ‘Does Improved Irrigation Technology Save Water? A Review of the Evidence’ (Discussion Paper, Food and Agriculture Organization of the United Nations, 2017). 

RCE304: Chris Perry, Pasquale Steduto and Fawzi Karajeh, ‘Does Improved Irrigation Technology Save Water? A Review of the Evidence’ (Final Report, Food and Agriculture Organization of the United Nations, 2017). 

RCE305: Chris Perry, ‘Does Improved Irrigation Technology Save Water: a Review of the Evidence – an update’ (Discussion Paper, Food and Agriculture Organisation of the United Nations, 25 April 2018)

RCE306: Chris Perry, Submission No 47 to Standing Committee on Agriculture and Water Resources, Parliament of Australia, Inquiry into Water Use Efficiency in Australian Agriculture, 2017. 

6 September, 2018 

RCE307: David Papps, Submission to Murray-Darling Basin Royal Commission, 2018.

RCE308: Commonwealth Environmental Water Office, 'Framework for Determining Environmental Water Use' (May 2013).

RCE309: Commonwealth Environmental Water Office, 'Commonwealth Environmental Water Trading Framework' (November 2016).

RCE310: Commonwealth Environmental Water Office, Carryover, Department of the Environment and Energy (Cth) <https://www.environment.gov.au/water/cewo/about/carryover>.

RCE311: Neil Byron, Natural Capital Economics, ‘Review of the Commonwealth Environmental Water Holder’s Operations and Business Processes’ (14 November 2017).

RCE312: Commonwealth Environmental Water Holder, 'Response to the Review of the Commonwealth Environmental Water Holder’s Operations and Business Processes' (January 2018).

RCE313: Letter from David Papps, Commonwealth Environmental Water Office to Phillip Glyde, Murray-Darling Basin Authority, November 2017.

RCE314: Letter from David Papps, Commonwealth Environmental Water Office to Phillip Glyde, Murray-Darling Basin Authority, November 2017.

RCE315: Letter from Mark Taylor, Commonwealth Environmental Water Office to Phillip Glyde, Murray-Darling Basin Authority, 2 February 2018.

RCE316: Paul Carlile, ‘Evaluating the Derivation of Environmental Water Use in the River Murray and Investigation of Alternative Methods: Advice to the Commonwealth Environmental Water Office' (December 2017).

RCE317: David Papps, Commonwealth Environmental Water Holder, Submission to Murray-Darling Basin Authority, The Sustainable Diversion Limit Adjustment Mechanism Assessment – Draft Determination, 1 November 2017.

RCE318: David Papps, Commonwealth Environmental Water Holder, Submission No 45 to the Senate Select Committee on the Murray-Darling Basin Plan, Parliament of Australia, Inquiry into the Murray-Darling Basin Plan, 17 September 2015.

RCE319: Commonwealth Environmental Water Holder, Supplementary Submission No 45 to the Senate Select Committee on the Murray-Darling Basin Plan, Parliament of Australia, Inquiry into the Murray-Darling Basin Plan, 29 January 2016.

RCE320: Commonwealth Environmental Water Holder, Submission No 2 to the House of Representatives Standing Committee on the Environment and Energy, Parliament of Australia, Inquiry into the Management and Use of Commonwealth Environmental Water, 2018.

RCE321: Department of the Environment and Energy (Cth), Submission No 38 to House of Representatives Standing Committee on the Environment and Energy, Parliament of Australia, Inquiry into the Management and Use of Commonwealth Environmental Water, 18 April 2018.

RCE322: Evidence to Senate Rural and Regional Affairs and Transport Legislation Committee, Parliament of Australia, Canberra, 2 March 2018, 1–5, 32–40 (Jody Swirepik, Commonwealth Environmental Water Holder, Phillip Glyde, Chief Executive Murray-Darling Basin Authority and Daryl Quinlivan, Secretary Department of Agriculture and Water Resources). 

RCE323: Evidence to Senate Rural and Regional Affairs and Transport Legislation Committee, Parliament of Australia, Canberra, 25 May 2018, 1, 13–20, 35–39 (Senator Ruston, Phillip Glyde, Chief Executive Officer Murray-Darling Basin Authority, Paul Morris, First Assistant Secretary Department of Agriculture and Water Resources, Jody Swirepik, Commonwealth Environmental Water Holder, Daryl Quinlivan, Secretary Department of Agriculture and Water Resources, Malcolm Thompson, Deputy Secretary, Department of Agriculture and Water Resources (Cth)).

RCE324:Email from David Papps to Barry O’Sullivan, Senate Standing Committee on Rural and Regional Affairs and Transport, 21 April 2018.

RCE325: David Paton, University of Adelaide, Submission to Murray-Darling Basin Royal Commission, 30 April 2018.

RCE326: David Paton, Submission to Murray-Darling Basin Authority, The SDL Adjustment Mechanism Draft Determination Report, 3 November 2017.

RCE327: Letter from Warren Truss to Rob Kerin, 23 September 2001.

RCE328: Letter from Ian Campbell and Peter McGauran to Gail Gago, 7 December 2006.

RCE329: Emails between Fiona Paton and Justine Keuning, Department of Water Environment and Natural Resources (SA), October 2017. 

RCE330: David Paton, Fiona Paton and Colin Bailey, ‘Ecological Character Description for Ruppia tuberosa in the Coorong’ (Report, University of Adelaide, June 2015). 

RCE331: David Paton, Fiona Paton and Colin Bailey, ‘A Broad Synthesis of Waterbird Knowledge for the Coorong, Lower Lakes and Murray Mouth Region, Including Comment on Future Management and Monitoring Options’ (Report, University of Adelaide, October 2015).

RCE332: David Paton, Fiona Paton and Colin Bailey, ‘Monitoring of Ruppia tuberosa in the Southern Coorong, Summer 2016–17’ (Report, University of Adelaide, May 2017).

RCE333: David Paton, Fiona Paton and Colin Bailey, ‘Condition Monitoring of the Coorong, Lower Lakes and Murray Mouth Icon Site: Waterbirds in the Coorong and Lower Lakes 2017’ (Report, University of Adelaide, May 2017).

RCE334: David Paton, ‘Securing the Ecological Character of the Southern Coorong’ (Paper, University of Adelaide, August 2017).

RCE335: Emails between David Paton and Rebecca Quinn, Department of Environment, Water and Natural Resources (SA), August 2017.

RCE336: Jody O’Connor, ‘An Assessment of Ramsar Criteria and Limits of Acceptable Change for Waterbirds in the Coorong and Lakes Alexandrina and Albert Wetland’(DEWNR Technical Report 2015/58, December 2015).

RCE337: Letter from David Paton, University of Adelaide to Phillip Glyde, Murray-Darling Basin Authority, 8 April 2018.

RCE338: Letter from Phillip Glyde, Murray-Darling Basin Authority to David Paton, University of Adelaide, 19 August 2018.

RCE339: Letter from David Paton to Phillip Glyde, Murray-Darling Basin Authority.

RCE340: Letter from David Paton, University of Adelaide to Josh Frydenberg, Minister for the Environment and Energy (Cth), 8 April 2018.

RCE341: Letter from David Paton, University of Adelaide to Steven Marshall, Premier of South Australia, 8 April 2018. 

RCE342: Email from David Paton, University of Adelaide to David Speirs, Minister for Environment and Water (SA), 24 May 2018.

RCE343: Department of Environment, Water and Natural Resources (SA), ‘South East Flows Restoration Project: EPBC Act Referral – Coorong and Lakes Alexandrina and Albert Wetland of International Importance’ (Ramsar Information Sheet, May 2013).

RCE344: Department of Environment, Water and Natural Resources (SA), ‘South East Flows Restoration Project: Referral under the Environment Protection and Biodiversity Conservation Act 1999’ (11 March 2016). 

RCE345: Jason Modica, Healthy Rivers Healthy Communities, Submission to Murray-Darling Basin Royal Commission, 2018.

RCE346: Mildura Rural City Council, Submission to Murray-Darling Basin Royal Commission, 24 May 2018 with attachment: Ruth McGowan Pty Ltd,'Social Research Project: Assessing the Social Impacts of the Murray Darling Basin Plan on the Communities of Northern Victoria' (Report to the Murray-River Group of Councils, 4 December 2017).

RCE347: Mildura Rural City Council, 'South Australian Murray Darling Basin Royal Commission Response', 26 July 2018.

RCE348: Witness statement of Andrew Close, 28 August 2018.

RCE349: Andy Close, ‘Options for Reducing the Risk of Closure of the River Murray Mouth’ (MDBC Technical Report 2002/2, February 2002).

RCE350: Mac Kirby et al, ‘Drought and Climate Change in the Murray-Darling Basin: A Hydrological Perspective’ in Kurt Schwabe et al (eds), Drought in Arid and Semi-Arid Regions: A Multi-Disciplinary and Cross-Country Perspective (Springer, 2013) 281.

RCE351: A Close ‘Computer Modelling of the River Murray’ (Hydrology and Water Resources Symposium, Griffith University, 25-27 November 1986) 340.­­ 

RCE352: I Neave et al, ‘Managing Water in the Murray-Darling Basin under a Variable and Changing Climate: Dealing with Climate change in the 2012 Basin Plan and into the future’ (2015) 42(2) Water 102.

RCE 353 - 400
RCE353: Letter from Craig Knowles, Murray-Darling Basin Authority to Tony Burke, Minister for Sustainability, Environment, Water, Population and Communities (Cth), 21 November 2012 with attachments:   

Attachment D: Explanatory Statement, Basin Plan 2012 (Cth) - Water Act 2007 (Cth);

Attachment F: Murray-Darling Basin Authority, Statutory Requirements in Relation to the Basin Plan Development; and

Attachment G: ‘Synthesis of Analysis Associated with the Determination of an Environmentally Sustainable Level of Take (ESLT) for Surface Water and Groundwater in the Basin Plan’.

21 September, 2018 

RCE354: Letter from Bret Walker, Royal Commissioner to David Speirs, Minister for Environment and Water (SA), 24 August 2018. 

RCE355: South Australian Government, 'Response to Request for Clarification of South Australian Government Submission' (September 2018).

RCE356: Letter from Bret Walker, Royal Commissioner to David Speirs, Minister for Environment and Water (SA), 10 September 2018.

RCE357: Letter from David Speirs, Minister for Environment and Water (SA) to Bret Walker, Royal Commissioner, 14 September 2018.

RCE358: Queensland Government, Submission to Murray-Darling Basin Royal Commission, May 2018.

RCE359: Letter from Bret Walker, Royal Commissioner, to David Wiskar, Department of Natural Resources, Mines and Energy (Qld), 7 September 2018.

RCE360: New South Wales Government, Submission to Murray-Darling Basin Royal Commission, 22 May 2018.

RCE361: Letter from Joanne Masters, Murray-Darling Basin Royal Commission to Kathleen Hainsworth, NSW Crown Solicitor's Office, 7 September 2018. 

RCE362: Letter from Kathleen Hainsworth, NSW Crown Solicitor's Office, to Joanne Masters, Murray-Darling Basin Royal Commission, 14 September 2018.

RCE363: Letter from Daniel Andrews, Premier of Victoria, to Bret Walker, Royal Commisioner, 31 July 2018.

RCE364: Victorian Government, Submission to the Murray-Darling Basin Royal Commission, 2018.

RCE365: Letter from Bret Walker, Royal Commissioner to Daniel Andrews, Premier of Victoria, 7 September 2018. 

RCE366: Letter from Janine Hebiton, Victorian Government Solicitor's Office, to Joanne Masters, Murray-Darling Basin Royal Commission, 14 September 2018.

RCE367: Letter from Joanne Masters, Murray-Darling Basin Royal Commission to Jessica Parker, Australian Government Solicitor, 7 September 2018.

RCE368: Letter from Jessica Parker, Australian Government Solicitor to Joanne Masters, Murray-Darling Basin Royal Commission, 13 September 2018.

RCE369: David Littleproud, Minister for Agriculture and Water Resources (Cth), ‘Cooperating with SA Murray-Darling Royal Commission’ (Media Release, 13 September 2018).

RCE370: Robert Orr and Helen Neville, 'The Role of Social and Economic Factors in the Basin Plan' (Australian Government Solicitor, 25 October 2010).

RCE371: Witness Statement of Christopher Lamey, 19 September 2018.

RCE372: Chris Lamey, ‘Chronology of Events’ (2018).

RCE373: Chris Lamey, ‘The Trouble With Downstream’ (PowerPoint Presentation).

RCE374: Letter from Amy Fox, Department of Agriculture and Water Resources (Cth) to Chris Lamey, 10 May 2017.

RCE375: Letter from Dion Jones, Goondiwindi Regional Council to Lamey Contracting, 14 October 2016.

RCE376: Bundle of correspondence between Norman Farming and Goondiwindi Regional Council:        

a. Letter from Dion Jones, Goondiwindi Regional Council to Whynot Farm Co,10 October 2016.
b. Letter from Carl Manton, Goondiwindi Regional Council to Norman Farming,13 February 2017.
c. Letter from Carl Manton, Goondiwindi Regional Council to Norman Farming, 23 March 2017.
d. Letter from Carl Manton, Goondiwindi Regional Council to Norman Farming,13 April 2017.
e. Letter from Carl Manton, Goondiwindi Regional Council to John Norman, 18 August 2017.

RCE377: Letter from Charles Chan, Chan Lawyers to Chief Executive, Department of Natural Resources and Mines (Qld) and Goondiwindi Regional Council, 20 March 2017 and Letter from Nicole Buchanski, Department of Natural Resources and Mines (QLD) to Charles Chan, Chan Lawyers, 5 May 2017.

RCE378: Letter from Ralph P Kinsella, SMK Consultants Pty Ltd to Goondiwindi Regional Council, 1 August 2017.

RCE379: Letter from Carl Manton, Goondiwindi Regional Council to Norman Farming, 21 December 2017.

RCE380: CBRE Agribusiness, 'Norman Farming: Information Memorandum' (October 2017).

RCE381: Mark Phelps, ‘Toobeah Farmers 'Flooded out of Business’, Queensland Country Life (online), 26 April 2017 https://www.queenslandcountrylife.com.au/story/4623701/illegal-flood-hits-toobeah-farmers/.

RCE382: Graeme Scheu, Goondiwindi Regional Council, ‘Council Explains Options in Relation to Levee Banks’ (Media Release, 28 August 2017).

RCE383: Kerry Brewster, ‘Murray-Darling Basin Plan a "Failure", Farmers Claim Water Backed up in Queensland’, ABC News (Online), 1 September 2017  <http://www.abc.net.au/news/2017-08-31/murray-darling-basin-plan-failure-farmers-claim-water-backed-up/8859412

RCE384: Kerry Brewster, ‘Murray Darling Basin Authority Powerless to Act against Farmers Harvesting Floodwaters’, ABC News (online), 13 February 2018 <http://www.abc.net.au/news/2018-02-13/murray-darling-authority-powerless-against-floodwater-harvesting/9426138>. 

RCE385: ABC News, ‘Some Farmers say Murray Darling River System is Broken’, 7.30 with Leigh Sales, 13 February 2018  <http://www.abc.net.au/7.30/some-farmers-say-murray-darling-river-system-is/9443850>.

RCE386: PMSEIC Independent Working Group 2007, ‘Climate Change in Australia: Regional Impacts and Adaptation – Managing the Risk for Australia’ (Report Prepared for the Prime Minister’s Science, Engineering and Innovation Council, June 2007).

RCE387: A M Ukkola et al, ‘Land Surface Models Systematically Overestimate the Intensity, Duration and Magnitude of Seasonal-Scale Evaporative Droughts’ [2016] Environmental Research Letters 11.

RCE388: Jason Evans, Andy Pitman and Faye Cruz, ‘Coupled Atmospheric and Land Surface Dynamics over Southeast Australia: A Review, Analysis and Identification of Future Research Priorities’ (2011) 31 International Journal of Climatology 1758.

RCE389: Wenju Cai et al, ‘Rising Temperature Depletes Soil Moisture and Exacerbates Severe Drought Conditions across Southeast Australia’ (2009) 36 Geophysical Research Letters L21709.

RCE390: Caroline Ummenhofer, ‘What Causes Southeast Australia’s Worst Droughts?’ (2009) 36 Geophysical Research Letters L04706.

RCE391: Andrew Pitman and Sarah Perkins, ‘Climate Change Science: Status, and Next Steps in the Projection of Future Changes’ (2007) 7(3) Environmental Health 22.

RCE392: CSIRO, ‘A Report from the CSIRO to the Murray-Darling Basin Authority: Advice on Defining Climate Scenarios for use in the Murray-Darling Basin Authority Basin Plan Modelling' (MDBA Publication No 33/09, July 2009).

25 September, 2018 

RCE393: Jason Alexandra, ‘Risk and Uncertainty in Water Planning’.

RCE394: Witness Statement of Jason Alexandra, 24 September 2018.

RCE395: Jason Alexandra, Notice of Intention to Appear Before the Murray-Darling Basin Royal Commission, 4 September 2018.

RCE396: CSIRO, ‘Climate Variability and Change in South-Eastern Australia: A Synthesis of Findings from Phase 1 of the South Eastern Australian Climate Initiative (SEACI)’ (Report, May 2010).

RCE397: CSIRO, ‘Climate and Water Availability in South-Eastern Australia: A Synthesis of Findings from Phase 2 of the South Eastern Australian Climate Initiative (SEACI)’ (Report, September 2012).

RCE398: Graham Marshall and Jason Alexandra, ‘Institutional Path Dependence and Environmental Water Recovery in Australia’s Murray-Darling Basin’ (2016) 9(3) Water Alternatives 679.

RCE399: Jason Alexandra, ‘Risks, Uncertainty and Climate Confusion in the Murray-Darling Basin Reforms’ (2017) 3(3) Water Economics and Policy 1.

RCE400: Jason Alexandra, ‘Evolving Governance and Contested Water Reforms in Australia’s Murray Darling Basin’ (2018) 10 Water 113.

 RCE 401 - 460
RCE401: Jason Alexandra, ‘“Tax Returns for Water”: Satellite-Audited Statements Can Save the Murray-Darling’, The Conversation (online), 3 August 2017, <https://theconversation.com/tax-returns-for-water-satellite-audited-statements-can-save-the-murray-darling-81833>.

RCE402: Bernard Keane, ‘MDB Stakeholders Call for RSPT-Style Campaign against Government’, Crikey (online), 27 October 2010 <https://www.crikey.com.au/2010/10/27/mdb-stakeholders-call-for-rspt-styl....

RCE403: Andrew Crook, ‘Murray-Darling Authority Losing the Spin War with Councils’ PR Flacks’, Crikey (online), 09 November 2010 <https://www.crikey.com.au/2010/11/09/murray-darling-authority-losing-the....

RCE404: Andrew Campbell, ‘Murray Murmurings: Rethinking the Basin Plan’, Crikey (online), 16 November 2010 <<https://blogs.crikey.com.au/rooted/2010/11/16/murray-murmurings-rethinki....

RCE405: Curriculum Vitae of Jason Alexandra, October 2017.

RCE406: Mike Young, Submission to the Murray-Darling Basin Royal Commission, 2018.

RCE407: Witness Statement of Mike Young, 24 September 2018.

RCE408: Mike Young, ‘Sharing Water: The Role of Robust Water-Sharing Arrangements in the Management of Water Scarcity’ (Paper, 2018).

RCE409: Sarah Wheeler et al, ‘Developing a Water Market Readiness Assessment Framework’ (2017) 552 Journal of Hydrology 807.

RCE410: Michael D Young, ‘Unbundling Water Rights as a Means to Improve Water Markets in Australia’s Southern Connected Murray-Darling Basin’ in M Lago et al (eds), Use of Economic Instruments in Water Policy (Springer, 2015), 279.

RCE411: Mike Young, ‘Trading into Trouble? Lessons from Australia’s Mistakes in Water Policy Reform Sequencing’ (2015) 403 The Hikone Ronso 50.

RCE412: Michael D Young, ‘Designing Water Abstraction Regimes for an Ever-Changing and Ever-Varying Future’ (2013) 145 Agricultural Water Management 32.

RCE413: Mike Young, ‘Chewing on the CEWH: Options for Improving Management of Environmental Water in the Murray-Darling Basin’ in John Quiggin, Thilak Mallawaarachchi and Sarah Chambers (eds), Water Policy Reform: Lessons in Sustainability from the Murray-Darling Basin (Edward Elgar Publishing Limited, 2012), 129.

RCE414: Mike Young, ‘Improving the Basin Plan: Options for Consideration’ in D Connell and R Q Grafton (eds), Basin Future: Water Reform in the Murray-Darling Basin (ANU EPress, 2011), 439.

RCE415: Mike Young, ‘Environmental Effectiveness and Economic Efficiency of Water Use in Agriculture: The Experience of and Lessons from the Australian Water Reform Programme’ (OECD Report, 2010).

RCE416: Michael D Young and Jim C McColl, ‘Double Trouble: the Importance of Accounting for and Defining Water Entitlements Consistent with Hydrological Realities’ (2009) 53 The Australian Journal of Agricultural and Resource Economics 19.

RCE417: Mike Young and Jim McColl, ‘A future Proofed Basin – A new Water Management Regime for the Murray Darling Basin’ (The University of Adelaide, 2008).

RCE418: Mike Young and Jim McColl, ‘A sustainable Cap: What Might it Look Like?’ (Droplet No 12, University of Adelaide, 15 June 2008.

RCE419: Diamond Valley Groundwater Management Plan.

RCE420: Mike Young and Jim McColl, ‘Sustainable Diversion Limits: A Plan for the Murray-Darling Basin’ (Droplet No 19, University of Adelaide, 25 July 2011).

26 September, 2018

RCE421: Correspondence from the Victorian Government Solicitor's Office:        

a. Letter from Janine Hebiton, Victorian Government Solicitor's Office to Joanne Masters, Murray-Darling Basin Royal Commission, 21 September 2018                                                      

b. Letter from Alison O'Brien, Victorian Government Solicitor to Bret Walker, Royal Commissioner, 25 September 2018.

27 September, 2018 

RCE422: Emma Carmody, Notice of Intention to Appear Before the Murray-Darling Basin Royal Commission, 11 June 2018.

RCE423: David Morris, EDO NSW, Submission to Murray-Darling Basin Royal Commission, 30 April 2018.

RCE424: Northern Basin Review (Namoi Water) Freedom of Information Documents provided by Emma Carmody:                                                                              

a. Bill Johnson, 'Summary of the Namoi Water Northern Basin Review FOI Docs'.                                                  

b. Emails between Phil Townsend, Murray-Darling Basin Authority and Namoi Water, 22 July 2016-4 September 2018.                                                                                         

c. Emails between Unknown Sender and Peta Derham, Murray-Darling Basin Authority, 27 July 2016.                                                                           

d. Email from Frank Walker, Murray-Darling Basin Authority to Uknown Recipients, 17 August 2016.                                                     

e. Emails between Peta Derham, Carl Binning, and Phil Glyde, Murray-Darling Basin Authority, 11-29 November 2016.                                    

f. Industry Sector Employment Figures for Warren 2001-2013.

RCE425:  Emails between Peta Derham, Murray-Darling Basin Authority and Grant Buckley, Macquarie River Food & Fibre, 6-17 May 2016.

RCE426: Various documents provided by Emma Carmody: 

a. Letter from Emma Carmody, EDO NSW, to Bev Smiles, Inland Rivers Network, 23 September 2016;

b. Department of Primary Industries (NSW), ‘Approach to the Prerequisite Policy Measures Implementation Plan’ (PowerPoint Presentation);        

c. Department of Primary Industries (NSW),  'NSW Prerequisite Policy Measures Implementation Plan' (Draft, Version 2, 8 May 2015);

d. Letter from Emma Carmody, EDO NSW, to Chayna Moldrich, Department of Primary Industries (NSW), 29 May 2015;

f. Department of Agriculture and Water Resources (Cth), 'Murray-Darling Basin National Partnership Agreement: Milestone Assessments for Year Ending' (Agreement, 30 June 2015);

g. Warren Martin and Graeme Turner, ‘SDL Adjustment Stocktake Report’, (August 2015);

h. Select Committee on the Murray–Darling Basin Plan, Parliament of Australia, Murray–Darling Basin Authority: Response to Questions on Notice (2 February 2016);

i. Department of Primary Industries (NSW), 'Proposed Arrangements for Shepherding Environmental Water in NSW – Draft for Consultation' (May 2012);

j. Department of Primary Industries (NSW), 'Water Shepherding Option and Issues Analysis Report' (Advice to Water Shepherding Taskforce, May 2012);

k. EDO NSW, Submission to Department of Primary Industries (NSW), Proposed Arrangements for Shepherding Environmental Water in NSW: Draft for Consultation, 5 July 2012;

l. Department of Primary Industries (NSW), 'Accounting for the Third Toorale Water Shepherding Trial: August–September 2010' (January 2012);

m. Letter from Penny Wong, Minister for Climate Change, Energy Efficiency and Water (Cth) to Steve Whan, Acting Minister for Water (NSW), 13 July 2010;   

n. Department of Primary Industries (NSW), 'Shepherding Water for the Environment: Progress of the NSW Water Shepherding Project, 2011' (October 2011);      

o. Email from John Taylor, Murray-Darling Basin Authority to Emma Carmody, forwarding email of Russell James, Murray-Darling Basin Authority, 21 November 2016.

RCE427: Letter from Emma Carmody, EDO NSW to Terry Korn, Australian Floodplain Association, 14 March 2017.

RCE428: Letter from Brendan Dobbie, EDO NSW, to Susi Curtis, WaterNSW, 12 February 2018.

RCE429: Letter from Emma Carmody, EDO NSW to Terry Korn, Australian Floodplain Association, 5 February 2018.

RCE430: Various Briefing Notes and Submissions Provided by Emma Carmody:                                                                    

a. EDO NSW, 'Water Management Act Amendment Bill 2018, EDO NSW Briefing Note and Key Issues Summary', (Briefing Note, EDO NSW, 19 June 2018);                                                                                           

b. EDO NSW, 'Water Management Act Amendment Bill 2018, EDO NSW Briefing Note and Key Issues Summary', (Briefing Note, EDO NSW, 25 May 2018);                                                                                             

c. Letter from Emma Carmody, EDOs of Australia to Neil Andrews, Murray-Darling Basin Authority, 3 November 2017; 

d. EDOs of Australia, Submission No DR133 to Productivity Commission, National Water Reform, 31 October 2017;                                                         

e. Emma Carmody, EDOs of Australia, Submission No 245 to Murray-Darling Basin Authority, Proposed Amendments to Basin Plan, 24 February 2017.

RCE431: Letter from Emma Carmody, EDO NSW to Juliet Lefeuvre, Lifeblood Alliance, 27 June 2017.           

RCE432: Letter from Emma Carmody, EDO NSW to Chris Lamey, 13 December 2017.

RCE433: Emma Carmody, ‘Climate Change is Water Change: Integrating Water Management, Mitigation and Adaptation Laws and Policies’ (2017) 31(10) Australian Environment Review 358.

RCE434: Emma Carmody, ‘Changes in Murray-Darling Basin Laws and Policies between 2007 and 2016’ (2016) 19 Bridging 6.

RCE435: Emma Carmody et al, ‘The Future of Water Reform in Australia - Starting a Conversation’ (2016) 31(4) Australian Environment Review 132.

RCE436: Emma Carmody, ‘Exemptions from Cease-to-Pump Rules in the Hunter Coal Field: Mines 1, Aquifers 0’ (2013) 28(4)  Australian Environment Review 567. 

RCE437: Emma Carmody, ‘The Silence of the Plan: Will the Convention on Biological Diversity and the Ramsar Convention be Implemented in the Murray-Darling Basin?’ (2013) Environmental and Planning Law Journal 56.

RCE438: Emma Carmody, ‘Is the Murray-Darling Basin Plan Enlightened? Ask Voltaire’, The Conversation (online), 12 February 2013, <https://theconversation.com/is-the-murray-darling-basin-plan-enlightened-ask-voltaire-11468>.

RCE439: Jonathan La Nauze and Emma Carmody, ‘Will the Basin Plan Uphold Australia's Ramsar Convention Obligations?’ (2012) 27(9) Australian Environment Review 311.

RCE440: Emma Carmody, EDO NSW, The Northern Basin Disallowance: Parliament Votes to Protect Murray-Darling Basin Plan (16 February 2018) Legal Updates <https://www.edonsw.org.au/northern_basin_disallowance>.

RCE441: Emma Carmody, EDO NSW, Threats to Wetlands in the Murray-Darling Basin (23 October 2015) Blog <https://www.edonsw.org.au/threats_to_wetlands_in_the_murray_darling_basin>.

RCE442: Emma Carmody, EDO NSW, Managing Water Flows in the Murray-Darling Basin: a Rebalance will Benefit us All (29 August 2016) Blog <https://www.edonsw.org.au/managing_water_flows_in_the_murray_darling_basin_a_rebalance_will_benefit_us_all>.

RCE443: Emma Carmody, EDO NSW, Complementary Measures: Is Carp Herpes Really a Substitute for Water in the Murray-Darling? (2 February 2017) Legal Updates <https://www.edonsw.org.au/complementary_measures_is_carp_herpes_really_a_substitute_for_water_in_the_murray_darling>.

RCE444: 'Part 8: Access to information, Case study: Macquarie Marshes Environmental Landholders’ Association and floodplain harvesting'.

RCE445: Email from Emma Carmody EDO NSW, to Michael Opacic, Murray-Darling Basin Royal Commission, 26 September 2016 Forwarding Emails Between Michael Slezak, ABC News and Dominique, Murray-Darling Basin Authority Media Team, 14-15 May 2018.. 

RCE446: Letter from David Speirs, Minister for Environment and Water (SA) to Bret Walker, Royal Commissioner, 20 September 2018.

RCE447: Chrissie Bloss et al, ‘Hydro-Ecological Analysis of the Proposed Basin Plan – South Australian Floodplain’ (Technical Report DFW 2012/11, March 2012).

RCE448: Theresa Heneker and Jason Higham, ‘Review of the Basin Plan Water Recovery Scenarios for the Lower Lakes, South Australia: Hydrological and Ecological Consequences’ (Technical Report, DENR, March 2012).

RCE449: Jason Higham, ‘An Analysis of MDBA Modelling Outputs for the Draft Basin Plan: Hydrodynamic Modelling of the Coorong and Murray Mouth- Assessing the Implications for the Murray Mouth and Biota of the REeion’ (Technical Report, DENR, March 2012).

RCE450: Letter from Ben Bruce, Department for Environment and Water (SA), to Bret Walker, Royal Commissioner, 26 June 2018.

RCE451: Letter from David Littleproud, Minister for Agriculture and Water Resources (Cth) to David Speirs, Minister for Environment and Water (SA), 2 July 2018.

RCE452: Department of Environment, Water and Natural Resources (SA), ‘Murray Futures: Coorong, Lower Lakes and Murray Mouth Recovery Project, South East Flows Restoration Project - Phase 2 Business Case’ (12 March 2013).

RCE453: Department of Environment, Water and Natural Resources (SA), ‘The Living Murray Environmental Works and Measures Program: Chowilla Floodplain, Sustainable Diversion Limit Adjustment Mechanism Supply Measure Phase 2 Submission’.

RCE454: Murray-Darling Basin Authority, ‘Appendix 1: Chowilla Floodplain: Environmental Water Management Plan’ (MDBA Publication No 220/11, February 2012).

RCE455: Department of Environment, Water and Natural Resources (SA) and Murray-Darling Basin Authority, ‘Chowilla Floodplain: Operations Plan for Chowilla Creek Regulator and Ancillary Structures’ (Version 2.3, August 2014).

RCE456: Department of Environment, Water and Natural Resources (SA) and Murray-Darling Basin Authority, ‘Chowilla Floodplain: Event Plans and Hazard Mitigation Strategy for Operation of the Chowilla Creek Regulator and Ancillary Structures’ (Version 2.3, August 2014).

RCE457: Department of Environment, Water and Natural Resources (SA) and Murray-Darling Basin Authority, ‘Chowilla Floodplain: Monitoring Strategy for Operation of the Chowilla Creek Regulator and Ancillary Structures’ (Version 2.2, August 2014).

RCE458: Murray-Darling Basin Authority, ‘Enhanced Environmental Water Delivery: A Business Case for the Sustainable Diversion Limit Adjustment Mechanism’ (Draft Proposal, 9 May 2017).

RCE459: Murray-Darling Basin Authority, ‘Addendum: Enhanced Environmental Water Delivery’ (Draft Addendum to Business Case).

RCE460: Murray-Darling Basin Authority, ‘Attachment 1: EEWD Revised Budget’ (Addendum to Business Case, September 2017).

RCE 461 - 511
RCE461: Murray-Darling Basin Ministerial Council, 'Implementing the Basin Plan' (Report to the Council of Australian Governments, 17 March 2017).

RCE462: Productivity Commission, 'National Water Reform: Overview and Draft Recommendations' (Draft Report, September 2017).

RCE463: Murray-Darling Basin Authority, 'Annual Report 2016–17' (MDBA publication No 28/17, 2017).

RCE464: Murray-Darling Basin Authority, ‘Basin Plan Evaluation 2017’ (MDBA Publication No 52/17, 2017).

RCE465: Senate Rural and Regional Affairs and Transport References Committee, Parliament of Australia, Integrity of the Water Market in the Murray-Darling Basin (2017).

RCE466: Australian National Audit Office ‘ Department of Agriculture and Water Resources’ Assessment of New South Wales’ Protection and use of Environmental Water under the National Partnership Agreement on Implementing Water Reform in the Murray-Darling Basin’ (ANAO Report No 17 2017-18, 2017).

RCE467: Ernst & Young, ‘Analysis of Efficiency Measures in the Murray-Darling Basin: Opportunities to Recover 450GL in Additional Environmental Water Through Efficiency Measures by 2024, with Neutral or Positive Socio-Economic Impacts’ (Final Report, 19 January 2018).

RCE468: Birdlife Australia, ‘Birds of the Murray-Darling Basin: Overview’ (Birdlife Conservation Statement No 16, May 2014).

RCE469: House of Representative Standing Committee on Agriculture and Water Resources, Parliament of Australia, Making Every Drop Count: Inquiry into Water Use Efficiency Programs in Agriculture (2017). 

RCE470: Murray-Darling Basin Authority, ‘The Social and Economic Benefits from Environmental Water: 2017 Basin Plan Evaluation’ (MDBA Publication No 50/17, December 2017).

RCE471: S Lamontagne et al ‘Expert Panel Assessment of the Likely Ecological Consequences in South Australia of the Proposed Murray-Darling Basin Plan: A Report to the South Australian Government’ (Technical Report Series No 12/2, 2012).

RCE472: Murray-Darling Basin Ministerial Council, ‘An Audit of Water Use in the Murray-Darling Basin’ (Report, June 1995).

RCE473: Murray-Darling Basin Authority, ‘Water Resource Plan Quarterly Report' (January 2018).

RCE474: Department of Agriculture and Water Resources (Cth), ‘National Partnership Agreement on Implementing Water Reform in the Murray-Darling Basin: Milestone Assessments for the Year Ending 30 June 2016’ (2016).

RCE475: Murray-Darling Basin Authority, ‘Understanding change in Basin communities, Southern Basin Community Profiles’.

RCE476: TC&A and Frontier Economics, ‘Social and Economic Impacts of the Basin Plan in Victoria’ (February 2017).

RCE477: Commonwealth Government, ‘Report of the Independent Review of the Water Act 2007’ (November 2014).

RCE478: Department of Agriculture and Water Resources (Cth), ‘Commonwealth Water Reform Investments in the Murray–Darling Basin - Analysis of Social and Economic Outcomes’ (2017).

RCE479: Murray-Darling Basin Authority, ‘Ecological Needs of Low Flows in the Barwon-Darling’ (Technical Report, March 2018).

RCE480: Murray-Darling Basin Authority, ‘Observed Flows in the Barwon-Darling 1990-2017: A Hydrologic Investigation’ (Technical Report, March 2018).

RCE481: Murray-Darling Basin Authority, ‘Proposed Basin Plan Consultation Report’ (MDBA Publication No 59/12, May 2012).

RCE482: Murray-Darling Basin Authority, ‘Proposed Basin Plan Consultation Report - Appendix B’ (MDBA Publication No 59/12, May 2012).

RCE483: Murray-Darling Basin Authority, ‘Proposed Basin Plan - Authority's Views and Consultation on the Matters Raised by the Murray-Darling Ministerial Council -Volume 1’ (MDBA Publication No 70/12, August 2012).

RCE484: Murray-Darling Basin Authority, ‘Proposed Basin Plan - Authority's Views and Consultation on the Matters Raised by the Murray-Darling Ministerial Council -Volume 2’ (MDBA Publication No 71/12, August 2012). 

RCE485: Commonwealth Environmental Water Holder, ‘Portfolio Management Planning: Approach to Planning for the Use, Carryover and Trade of Commonwealth Environmental Water 2017-18’ (2017).

RCE486: Murray-Darling Basin Authority, ‘The Living Murray Story’ (MDBA Publication No 157/11, 2011).

RCE487: Commonwealth Environmental Water Holder, ‘Monitoring, Evaluation, Reporting and Improvement Framework' (Version 2.0, June 2013). 

RCE488: Senate Legal and Constitutional Affairs References Committee, Parliament of Australia, A Balancing Act: Provisions of the Water Act 2007 (2011)

RCE489: Fran Sheldon, ‘Characterising the Ecological Effects of Changes in the 'Low-Flow' Hydrology of the Barwon Darling River’ (Advice to the Commonwealth Environmental Water Holder Office, Australian Rivers Institute, October 2017).

RCE490: Gary Jones et al, ‘Independent Report of the Expert Reference Panel on Environmental Flows and Water Quality Requirements for the River Murray System’ (Cooperative Research Centre for Freshwater Ecology,  February 2002).

RCE491: Tony Minns, ‘Peer Review of the South Australian Government Eco-Hydrological Assessment of Additional Model Scenarios for the Basin Plan’ (Goyder Institute for Water Research).

RCE492: Steve Hemming and Daryle Rigney, ‘Indigenous Engagement in Environmental Water Planning, Research and Management: Innovations in South Australia's Murray-Darling Basin Region’ (Technical Report Series No 14/21, Goyder Institute for Water Research, 2014).

RCE493: Steve Hemming and Daryle Rigney, ‘Incorporating Indigenous Knowledge, Values and Interests Into Environmental Water Planning in the Coorong and Lakes Alexandrina and Albert Ramsar Wetland’ (Technical Report Series No 16/8, Goyder Institute for Water Research, 2016).

RCE494: Jeff Connor et al, ‘Socioeconomic Implications of the Guide to the Proposed Basin Plan - Methods and Results Overview’ (Technical Report Series No 11/3, Goyder Institute for Water Research, 2011).

RCE495: Taylor Hunt, ‘Progress Towards Outcomes From Environmental Water in Victoria: Five Years Into Basin Plan Implementation’ (Department of Environment, Land, Water and Planning (Vic), 2017).

RCE496: Productivity Commission, ‘Market Mechanisms for Recovering Water in the Murray-Darling Basin’ (Research Report, March 2010)

RCE497: Commonwealth Government, ‘Module to the National Water Initiative (NWI) Policy Guidelines for Water Planning and Management: Engaging Indigenous Peoples in Water Planning and Management' (2017)

RCE498: Department of Industry (Cth), ‘Water Reform Action Plan: Quarter 1 Progress Report (January-March 2018)' (2018).

RCE499: Murray-Darling Basin Authority, ‘Assessing Environmental Water Needs of the Basin’ (Report, 2010).

RCE500: Department of Industry (NSW), ‘Securing Our Water: NSW Government Water Reform Action Plan’ (Report, December 2017).

RCE501: Barry Hart and Rhonda Butcher, ‘Commonwealth Long-Term Intervention Monitoring Project: Stage 1 Mid-Term Review and Evaluation’ (Water Science and Water’s Edge Consulting Report, 2018)

RCE502: Senate Rural and Regional Affairs and Transport References Committee, Parliament of Australia, The Management of the Murray-Darling Basin (2013).

RCE503: Murray-Darling Basin Authority, ‘Regulation Impact Statement: Basin Plan - Water Act 2007 (Cth)’.

RCE504: Murray-Darling Basin Authority, ‘Delivering a Healthy Working Basin: About the Draft Basin Plan' (MDBA Publication No 65/10, 2011).

RCE505: Commonwealth Government, 'Australian Government Response to the Senate Rural and Regional Affairs and Transport References Committee Report: Management of the Murray-Darling Basin' (March 2018).

RCE506: Productivity Commission, ‘National Water Reform: Productivity Commission Inquiry Report’ (Report No 87, 19 December 2017). 

RCE507: Murray-Darling Basin Authority, ‘Plain English Summary of the Proposed Basin Plan – Appendix A’ (28 November 2011).

RCE508: Helen Gigney et al, ‘Clarification of Definitions in the Water Act 2007: Final Report’ (MDFRC Publication 07/20, Murray-Darling Freshwater Research Centre, May 2010).

RCE509: Murray-Darling Basin Authority, Letter from the Chair Craig Knowles to Environmental Groups (21 October 2011) <http://webarchive.nla.gov.au.gov/20120316211911/http://www.mdba.gov.au/draft-basin-plan/science-draft-basin-plan/letter-from-chair>.

RCE510: ACIL Tasman, ‘Scope for Water Use Efficiency Savings as a Source of Water to Meet Increased Environmental Flows - Independent Review: A Report to the Murray Darling Basin Commission’ (March 2003)

RCE511: Ian Waterson et al, ‘Climate Change in Australia: Projections for Australia's NRM Regions - Rangeland Cluster Report’ (CSIRO, 2015). 
RCE 512 - 560
RCE512: Marie Ekstrom et al, ‘Climate Change in Australia: Projections for Australia's NRM Regions - Central Slopes Cluster Report’ (CSIRO, 2015).

RCE513: Bertrand Timbal et al, ‘Climate Change in Australia: Projections for Australia's NRM Regions - Murray Basin Cluster Report’ (CSIRO, 2015).

RCE514: Victorian Ombudsman, ‘Investigation into the Foodbowl Modernisation Project and Related Matters’ (November 2011).

RCE515: Ben Gawne et al, ‘Long Term Intervention and Monitoring Project - Logic and Rationale Document – Version 1.0’ (MDFRC Publication 01/2013, Murray-Darling Freshwater Research Centre, May 2013).

RCE516: Rebecca E Lester et al, ‘Conceptual Modelling of the Ecological Responses from a Flood Event in the Lower River Murray’ (Technical Report Series No 14/11, Goyder Institute for Water Research, 2014).

RCE517: Sam Nicol et al, ‘A Method to Assess the Relative Environmental benefit of Complementary Measures: A Scoping Report and Proof of Concept – Version 2’ (Report for the Murray-Darling Basin Authority, Version 2, 13 April 2017).

RCE518: Victorian Auditor-General, ‘Irrigation Efficiency Programs’ (Report PP No 313, June 2010). 

RCE519: Neville Crossman et al, ‘Status of the Acquatic Ecosystems of the Murray-Darling Basin and a Framework for Assessing the Ecosystem Services they provide’ (Interim Report to the Murray-Darling Basin Authority, CSIRO, 28 November 2011).

RCE520: Murray-Darling Basin Authority, ‘Water Resource Plan: Quarterly Report' (May 2018).

RCE521: Richard T Kingsford et al, ‘Engineering a Crisis in a Ramsar Wetland: The Coorong, Lower Lakes and Murray Mouth’ (Report, Australian Wetlands and Rivers Centre, November 2009).

RCE522: Rebecca Lester et al, ‘An Investigation into Interactions between the Proposed Upper South East Drainage (USED) Scheme and Barrage Flows’ (Report to Department for Environment and Natural Resources (SA), June 2012).

RCE523: Environment Defenders Office (Vic), ‘Legal Analysis of the Proposed Murray-Darling Basin Plan’ (March 2012).

RCE524: Mike Young et al, ‘A Preliminary Assessment of the Economic and Social Implications of Environmental Flow Scenarios for the Murray River System’ (Report to Murray-Darling Basin Commission, CSIRO, July 2002)

RCE525: Murray-Darling Basin Authority and Department of Industry (NSW), ‘Consultation Paper: NSW Updated Factors for Water Recovery’ (Publication No 18/322, May 2018).

RCE526: Murray-Darling Basin Authority, ‘Water Resource Assessments for Without-Development and Baseline Conditions – Version 2’ (Technical Report No 2010/20,  November 2011).

RCE527: Murray-Darling Basin Authority, ‘Modelling Assessment to Determine SDL Adjustment Volume’ (MDBA Publication No 35/17, October 2017)

RCE528: Murray-Darling Basin Authority, ‘Benchmark Conditions of Development for Assessment of the SDL Supply Contribution’ (MDBA Publication No 36/17, October 2017).

RCE529: Department of Industry (NSW), ‘NSW Water Reform Action Plan: Water Take Measurement and Metering (Consultation Paper Pub18/161, March 2018)

RCE530: URS Australia, ‘Murray-Darling Basin Return Flows Investigation: Final Report - Volume 1’ (Report to Murray-Darling Basin Authority, October 2010). 

RCE531: Department of Industry (NSW), ‘Better Management of Environmental Water - Interim Solutions Package - Advice from the Interagency Working Group for Better Managing Environmental Water’ (Pub18/284, June 2018)

RCE532: Murray-Darling Basin Authority, ‘Basin Salinity Management Strategy  - 2014/15 Annual Implementation Report’ (MDBA Publication No 36/15, June 2016)

RCE533: Murray-Darling Basin Authority, ‘Basin Salinity Management Strategy - 2013/14 Annual Implementation Report’ (MDBA Publication No 03/15, 24 March 2015)

RCE534: Murray-Darling Basin Authority, ‘Basin Salinity Management Strategy - 2012/13 Annual Implementation Report’ (MDBA Publication No 03/14, January 2014)

RCE535: Murray-Darling Basin Authority, ‘Basin Salinity Management Strategy - 2010/11 Annual Implementation Report’ (MDBA Publication No 21/12, January 2012).

RCE536: Murray-Darling Basin Authority, ‘Basin Salinity Management Strategy - 2009/10 Annual Implementation Report’ (MDBA Publication No 118/11, January 2011)

RCE537: Murray-Darling Basin Authority, ‘Basin Salinity Management Strategy - 2008/09 Annual Implementation Report’ (MDBA Publication No 53/10, February 2010)

RCE538: Anne Jensen and Rebecca Turner, ‘Overland Corner Wetland Complex Management Plan’ (Report, August 2001).

RCE539: Productivity Commission, ‘Murray-Darling Basin Plan: Five-Year Assessment’ (Draft Report, August 2018).

RCE540: Michael Stewardson and Fiorenzo Guarino, ‘2015-16 Basin-Scale Evaluation of Commonwealth Environmental Water – Hydrology’ (MDFRC Publication 142/2017, Murray-Darling Freshwater Research Centre, 2017).

RCE541: Samantha Capon and Cherie Campbell, ‘2015-16 Basin-Scale Evaluation of Commonwealth Environmental Water – Vegetation Diversity' (MDFRC Publication 145/2017, Murray-Darling Freshwater Research Centre, 2017)

RCE542: Conference of the Parties, Convention on Wetlands of International Importance Especially as Waterfowl Habitat, Seventh Meeting of the Conference of the Contracting Parties to the Convention on Wetlands held in San Jose, Costa Rica from 10 to 18 May 1999, Res VII.8, Guidelines for Establishing and Strengthening Local Communities and Indigenous People’s Participation in the Management of Wetlands <https://www.ramsar.org/sites/default/files/documents/library/key_res_vii.08e.pdf>..

RCE543: Conference of the Parties, Convention on Wetlands of International Importance Especially as Waterfowl Habitat, Eighth Meeting of the Conference of the Parties to the Convention on Wetlands held in Valencia, Spain from 18 to 26 November 2002, Res VIII.19, Guiding Principles for Taking Into Account the Cultural Values of Wetlands for the Effective Management of Sites <https://www.ramsar.org/sites/default/files/documents/pdf/res/key_res_viii_19_e.pdf>. 

RCE544: Secretariat of the Convention on Biological Diversity, ‘Akwe: Kon Guidelines' (2004). 

RCE545: Conference of the Parties, Convention on Wetlands of International Importance Especially as Waterfowl Habitat, Ninth Meeting of the Conference of the Contracting Parties to the Convention on Wetlands held in Kampala, Uganda from 8 to 15 November 2005, Res IX.21, Taking into Account Cultural Values of Wetlands <https://www.ramsar.org/sites/default/files/documents/pdf/res/key_res_ix_21_e.pdf>.

RCE546: Conference of the Parties, Convention on Biological Diversity, Tenth Meeting of the Conference of the Parties to the Convention on Biological Diversity held in Nagoya, Japan from 18 to 29 October 2010, Res X/42, The Tkarihwaie:ri Code of Ethical Conduct to Ensure Respect for the Cultural and Intellectual Heritage of Indigenous and Local Communities <https://www.cbd.int/doc/meetings/cop/cop-10/official/cop-10-27-en.pdf>.

RCE547: Conference of the Parties, Convention on Biological Diversity, Fifth Meeting of the Conference of the Parties to the Convention on Biological Diversity held in Nairobi, Kenya from 15 to 26 May 2000, Dec V/16, Programme of Work on the Implementation of Art 8(j) and Related Provisions of the Convention on Biological Diversity <https://www.cbd.int/doc/meetings/cop/cop-05/official/cop-05-23-en.pdf>

RCE548: United Nations Declaration on the Rights of Indigenous Peoples, GA Res 61/295, UN GAOR, 61st sess, 107th plen mtg, Agenda Item 68, Supp No 49, UN DOC, A/RES/61/295 (2 October 2007)

RCE549: Murray-Darling Basin Authority, ‘A Yarn on the River: Getting Aboriginal Voices into the Basin Plan’ (MDBA Publication No 227/11, 2011)

RCE550: Murray-Darling Basin Authority, ‘Murray-Darling Basin Boundary Map’ (1 January 2015)

RCE551: Murray-Darling Basin Authority, ‘Guide to Traditional Owner Groups for Water Resource Plan Areas Map’ (30 June 2015)

RCE552: Susan Goff, ‘A Survey of Aboriginal Water Interests: Summary Report’ (MDBA Publication No 28/16, October 2016)

RCE553: Murray-Darling Basin Authority, ‘Water Resource Plans: Part 14 Guidelines' (MDBA Publication No 30/17, 2017)

RCE554: Murray-Darling Basin Authority, ‘Aboriginal Partnerships Action Plan: Building Partnerships with Traditional Owners’ (August 2017)

RCE555: Sue Jackson, ‘National Indigenous Water Planning Forum: Background Paper on Indigenous Participation in Water Planning and Access to Water’ (CSIRO Sustainable Ecosystems, February 2009). 

RCE556: National Water Commission, ‘A Review of Indigenous Involvement in Water Planning - 2013’ (2014).

RCE557: Bewsher Consulting, ‘Review of Hydrological Investigations Carried Out Under the Menindee Lakes Memorandum of Understanding’ (Final Report, NSW Office of Water, January 2012). 

RCE558: Bewsher Consulting, ‘Barwon-Darling Valley Independent Audit of Cap Model’ (Draft Report, Murray-Darling Basin Authority, January 2013)

RCE559: Bewsher Consulting, ‘Review of the Hydrological Modelling Frameworks Used to Inform Potential Basin Plan Amendments’ (Draft Report, Murray-Darling Basin Authority, September 2016)

RCE560: Department of Primary Industries (NSW), ‘Four Corners – ABC TV’ (Departmental Response, 20 July 2017).
RCE 561 - 611
RCE561: Murray-Darling Basin Authority and Independent Review Panel, ‘The Murray-Darling Basin Water Compliance Review’ (MDBA Publication No 44/17, November 2017).

RCE562: Ombudsman New South Wales, ‘Correcting the Record: Investigation into Water Compliance and Enforcement 2007-17 - A Special Report to Parliament under section 26 and 31 of the Ombudsman Act 1974' (8 March 2018).

RCE563: Ombudsman New South Wales, ‘Water: Compliance and Enforcement - A Special Report to Parliament under section 31 of the Ombudsman Act 1974' (17 August 2018).

RCE564: Independent Expert Panel, ‘Independent Audit of Queensland Non-Urban Water Measurement and Compliance: Final Report’ (23 March 2018). 

RCE565: Queensland Government, ‘Independent Audit of Queensland Non-Urban Water Measurement and Compliance’ (Queensland Government Response, June 2018). 

RCE566: Murray-Darling Basin Authority, ‘Gwydir Region Reach Report: Constraints Management Strategy’ (June 2015).

RCE567: Murray-Darling Basin Authority, ‘Murrumbidgee Reach Report: Constraints Management Strategy’ (July 2015).

RCE568: Murray-Darling Basin Authority, ‘River Murray from Hume to Yarrawonga Weir Reach Report: Constraints Management Strategy’ (August 2015).

RCE569: Murray-Darling Basin Authority, ‘River Murray from Yarrawonga to Wakool Junction Reach Report: Constraints Management Strategy’ (Final Report, July 2015). 

RCE570: Murray-Darling Basin Authority, ‘South Australian River Murray Reach Report: Constraints Management Strategy’ (August 2015). 

RCE571: Murray-Darling Basin Authority, ‘Goulburn River Reach Report: Constraints Management Strategy’ (2015). 

RCE572: Murray-Darling Basin Authority, 'Lower Darling Reach Report: Constraints Management Strategy' (August 2015). 

RCE573: Duplicate - see RCE 392

RCE574: Duplicate - see RCE 352

RCE575: Murray-Darling Basin Authority, ‘The Proposed Groundwater Baseline and Sustainable Diversion Limits: Method Report’ (MDBA Publication 16/12, 2012).

RCE576: Department of Primary Industries (NSW), ‘Menindee Lakes: Interim Project Proposal’ (Blackwatch Consulting Pty Ltd, May 2017). 

RCE577: Department of Primary Industry (NSW), ‘Attachment C: Amendment 1 to Structural and Operational Changes at Menindee Lakes (NSW)' (Blackwatch Consulting Pty Ltd, 1 May 2017).

RCE578: Department of Primary Industry (NSW), ‘Attachment D: Menindee Lakes Water Saving Project (NSW) - Accounting for Evaporative Savings' (Blackwatch Consulting Pty Ltd, 1 May 2017).

RCE579: Murray-Darling Basin Authority, ‘SDL Adjustment Mechanism Project Status’

RCE580: Victorian and NSW Minister's Independent Expert Panel, ‘Murray-Darling Basin SDL Adjustment Mechanism' (Confidential Report, 10 April 2017).

RCE581: Basin Officials Committee, ‘Phase 1 Assessment Guidelines for Constraint and Supply Proposals’.

RCE582: Basin Officials Committee, ‘Phase 2 Assessment Guidelines for Supply and Constraint Measure Business Cases’ (Revised, February 2016). 

RCE583: Basin Officials Committee, ‘Phase 3 Confirmation Guidelines for Supply and Constraint Measure Projects’ (Updated, February 2016). 

RCE584: Murray-Darling Basin Authority, ‘Sustainable Diversion Limit Adjustment Mechanism’ (Technical Workshop Outcomes, 10 July 2018).

RCE585: Murray-Darling Basin Authority, ‘The SDL Adjustment Mechanism’ (PowerPoint Presentation, 28 June 2018).

RCE586: Murray-Darling Basin Authority, ‘SDLAM Determination Modelling’ (PowerPoint Presentation, 28 June 2018).

RCE587: Mitchell Isaacs and Jeanine Murray, ‘MDBA Technical Workshop: NSW SDL Adjustment Projects – a Teaser’ (PowerPoint Presentation, New South Wales Government, 28 June 2018). 

RCE588: Diane Favier, ‘Supply Measure Projects: South Australia’ (Murray-Darling Basin Policy and Strategy, Department for Environment and Water (SA), June 2018) 

RCE589: Environmental Land Water and Planning (Vic), ‘Victoria’s SDL Adjustment Projects’ (Annual Technical Workshop, 28 June 2018).

RCE590: Duplicate - see RCE 448

RCE591: Duplicate - see RCE 449

RCE592: Peter Davies et al, ‘Sustainable Rivers Audit 1: A Report on the Ecological Health of Rivers in The Murray-Darling Basin, 2004-2007’ (MDBC Publication No 16/08, Independent Sustainable Rivers Audit Group, June 2008). 

RCE593: Murray-Darling Basin Commission, ‘Sustainable Rivers Audit – Murray-Darling Basin Rivers: Ecosystem Health Check, 2004-2007’ (MDBC Publication No 19/08, June 2008). 

RCE594: Murray-Darling Basin Authority, ‘Sustainable Rivers Audit 2: The Ecological Health of Rivers in the Murray-Darling Basin at the End of the Millennium Drought (2008-2010) – Summary’ (MDBA Publication No 75/12, 2012) 

RCE595: Peter Davies et al, ‘Sustainable Rivers Audit 2: The Ecological Health of Rivers in the Murray-Darling Basin at the End of the Millennium Drought (2008-2010 – Volume 1)’ (MDBA Publication No 72/12, Independent Sustainable Rivers Audit Group, 2012). 

RCE596: Peter Davies et al, ‘Sustainable Rivers Audit 2: The Ecological Health of Rivers in the Murray-Darling Basin at the End of the Millennium Drought (2008-2010 – Volume 2)’ (MDBA Publication No 73/12, Independent Sustainable Rivers Audit Group, 2012) 

RCE597: Peter Davies et al, ‘Sustainable Rivers Audit 2: The Ecological Health of Rivers in the Murray-Darling Basin at the End of the Millennium Drought (2008-2010 – Volume 3)’ (MDBA Publication No 74/12, Independent Sustainable Rivers Audit Group, 2012) 

RCE598: Peter Davies et al, ‘Sustainable Rivers Audit 2: The Ecological Health of Rivers in the Murray-Darling Basin at the End of the Millennium Drought (2008-2010) – Interpreting the Results Fact Sheet’ (Independent Sustainable Rivers Audit Group) 

RCE599: Kane Aldridge, Goyder Institute for Water Research, Submission to Murray-Darling Basin Royal Commission, 21 May 2018.

RCE600: Murray-Darling Basin Authority, ‘Basin-Wide Environmental Watering Strategy’ (MDBA Publication  No 20/14, 24 November 2014).

RCE601: Murray-Darling Basin Authority, ‘Environmental Management Framework Implementation: 2017 Basin Plan Evaluation’ (MDBA publication No 41/17, December 2017)

RCE602: Murray-Darling Basin Authority, ‘Environmental Assets: 2017 Evaluation’ (MDBA Publication No 08/18, April 2018).

RCE603: Department of Environment, Water and Natural Resources (SA), ‘Long Term Environmental Watering Plan for the South Australian River Murray Water Resource Plan Area’ (November 2015).

RCE604: Murray-Darling Basin Authority, Submission No 86 to Productivity Commission, Murray-Darling Basin Plan: Five-Year Assessment, May 2018.

RCE605: Department of Agriculture and Water Resources (Cth), Submission No 81 to Productivity Commission, Murray-Darling Basin Plan: Five-Year Assessment, 7 May 2018.

RCE606: Commonwealth Environmental Water Holder, Submission No 75 to Productivity Commission, Murray-Darling Basin Plan: Five-Year Assessment, 1 May 2018.

RCE607: South Australian Government, Submission No 85 to Productivity Commission, Murray-Darling Basin Plan: Five-Year Assessment, April 2018.

RCE608: Queensland Government, Submission No 87 to Productivity Commission, Murray-Darling Basin Plan: Five-Year Assessment, May 2018.

RCE609: Lisa Neville, Minister for Water (Vic), Submission No 89 to Productivity Commission, Murray-Darling Basin Plan: Five-Year Assessment, 16 July 2018.

RCE610: Murray-Darling Basin Authority, Submission No DR136 to Productivity Commission, Murray-Darling Basin Plan: Five-Year Assessment, October 2018.

RCE611.
Department of Agriculture and Water Resources (Cth), Submission No DR103 to Productivity Commission, Murray-Darling Basin Plan: Five-Year Assessment, 2018.
RCE 612 - 662
RCE612. Commonwealth Environmental Water Holder, Submission No DR110 to Productivity Commission, Murray-Darling Basin Plan: Five-Year Assessment, 10 October 2018.

RCE613. Department of Industry (NSW), Submission No DR123 to Productivity Commission, Murray-Darling Basin Plan: Five-Year Assessment, October 2018.

RCE614. Chris Edwards, Submission to Murray-Darling Basin Royal Commission, 20 February 2018.

RCE615. Keith Peasley, Submission to Murray-Darling Basin Royal Commission, 2018.

RCE616. Robert Vincin, Submission to Murray-Darling Basin Royal Commission, 2018.

RCE617. Brian Chatterton, Submission to Murray-Darling Basin Royal Commission, 2018.

RCE618. Warren Gould, Submission to Murray-Darling Basin Royal Commission, 2018.

RCE619. Paul Newell, Submission to Murray-Darling Basin Royal Commission, 2018.

RCE620. Alastair Wood, Submission to Murray-Darling Basin Royal Commission, 2018.

RCE621. Rosa Hillam, Submission to Murray-Darling Basin Royal Commission, 2018.

RCE622. Paul Connellan, Submission to Murray-Darling Basin Royal Commission, April 2018.

RCE623. Keith Greenham, Submission to Murray-Darling Basin Royal Commission, 2018.

RCE624. Russell Peate, Mid Murray Council, Submission to Murray-Darling Basin Royal Commission, 16 April 2018

RCE625. Donald J Macleod, Submission to Murray-Darling Basin Royal Commission, 11 April 2018.

RCE626. Peter Bond, Submission to Murray-Darling Basin Royal Commission, April 2018.

RCE627. Tom Martin, Submission to Murray-Darling Basin Royal Commission, 2018.

RCE628. Ross Howse, Submission to Murray-Darling Basin Royal Commission, 2018.

RCE629. Thomas Dineen, Submission to Murray-Darling Basin Royal Commission, 19 April 2018.

RCE630. Elizabeth Tregenza, River Lakes and Coorong Action Group Inc, Submission to Murray-Darling Basin Royal Commission, 2018.

RCE631. Mark Hutton, The Broken Hill and Darling River Action Group Inc, Submission to Murray-Darling Basin Royal Commission, 20 April 2018.

RCE632. Bernard Griffin, Australian Labor Party, West Wallsend Branch, Submission to Murray-Darling Basin Royal Commission, 26 April 2018.

RCE633. Desmond Connellan, Narwie Partners, Submission to Murray-Darling Basin Royal Commission, March 2018.

RCE634. Adrian Kidd, Water Advisory Committee to the Mildura Branch of the Liberal Party Submission to Murray-Darling Basin Royal Commission, 20 April 2018.

RCE635. Alistair Watson, Submission to Murray-Darling Basin Royal Commission, 2018.

RCE636. Tony Siviour, Renmark Paringa Council, Submission to Murray-Darling Basin Royal Commission, 27 April 2018.

RCE637. Mitchell Clapham, NSW Farmers’ Association, Submission to Murray-Darling Basin Royal Commission, April 2018.

RCE638. Dugald Bucknell, Quambone Pastoral Co. Pty Ltd, Submission to Murray-Darling Basin Royal Commission, 28 December 2017.

RCE639. Richard Sargood and Marie Dunn, Murray-River Action Group Inc, Submission to Murray-Darling Basin Royal Commission, 2018.

RCE640. Alan Herath, Submission to Murray-Darling Basin Royal Commission, 2018.

RCE641. Norm Brennan, Edward River Council, Submission to Murray-Darling Basin Royal Commission, 2018.

RCE642. Rob Foster, Submission to Murray-Darling Basin Royal Commission, April 2018.

RCE643. Brenton Rittberger, Submission to Murray-Darling Basin Royal Commission, 2018.

RCE644. John Pettigrew, Goulburn Valley Environment Group, Submission to Murray-Darling Basin Royal Commission, 30 April 2018.

RCE645. Travis Tobin, Queensland Farmers' Federation, Submission to Murray-Darling Basin Royal Commission, 30 April 2018

RCE646. Roch Cheroux, SA Water, Submission to Murray-Darling Basin Royal Commission, 27 April 2018

RCE647. Howard Pascoe, Howard Pascoe Consulting Pty Ltd, Submission to Murray-Darling Basin Royal Commission, 24 April 2018.

RCE648. Murray Jacobs, Submission to Murray-Darling Basin Royal Commission, 19 April 2018.

RCE649. Bill Bagley, Angas Partners, Submission to Murray-Darling Basin Royal Commission, 26 April 2018.

RCE650. Andrew Kelly, West Corurgan Private Irrigation District, Submission to Murray-Darling Basin Royal Commission, 30 April 2018.

RCE651. Suzanne Milthorpe, The Wilderness Society, Submission to Murray-Darling Basin Royal Commission, April 2018.

RCE652. Barry Croke, Submission to Murray-Darling Basin Royal Commission, 3 May 2018.

RCE653. Darriea Turley, Mayor, Broken Hill City Council, Submission to the Murray-Darling Basin Royal Commission, 2018.

RCE654. Barry Featherston, Murray-Darling Association Region 6, Submission to Murray-Darling Basin Royal Commission, 30 April 2018.

RCE655. Simon McArthur, Australian Regional Tourism Ltd, Submission to Murray-Darling Basin Royal Commission, 19 April 2018.

RCE656. Antia Brademann, Upper Murrumbidgee Demonstration Reach, Submission to Murray-Darling Basin Royal Commission, 30 April 2018.

RCE657. Richard Marsh, Balonne Shire Council, Submission to Murray-Darling Basin Royal Commission, 30 April 2018.

RCE658. David Shetliffe, Murray-Darling Association Region 7, Submission to Murray-Darling Basin Royal Commission, March 2018.

RCE659. Katrina Humphries, Moree Plains Shire Council, Submission to Murray-Darling Basin Royal Commission, 27 April 2018.

RCE660. Helen Dalton, Submission to Murray-Darling Basin Royal Commission, 2018.

RCE661. Bernard Griffin, Submission to Murray-Darling Basin Royal Commission, 2018.

RCE662. Cameron Holley, Darren Sinclair, Tariro Mutongwizo and Amelia Brown, Submission to Murray-Darling Basin Royal Commission, 27 April 2018.
RCE 663 - 713
RCE663. Rachel Kelly, Ricegrowers’ Association of Australia,  Submission to Murray-Darling Basin Royal Commission, April 2018.

RCE664. Austin Evans, Submission to Murray-Darling Basin Royal Commission, 2018.

RCE665. David Morris, Environmental Defender’s Offices of Australia, Submission to Murray-Darling Basin Royal Commission, 30 April 2018.

RCE666. John Hunt, SA Dairyfarmers' Association Inc, Submission to Murray-Darling Basin Royal Commission, 30 April 2018.

RCE667. Justine Keech, Deniliquin Business Chamber, Submission to Murray-Darling Basin Royal Commission, 30 April 2018.

RCE668. Peter Wadewitz, Australian Organics Recycling Association Ltd, Submission to Murray-Darling Basin Royal Commission, 30 April 2018.

RCE669. Anne Reeves, Inland Rivers Network, Submission to Murray-Darling Basin Royal Commission, 30 April 2018.

RCE670. Ruby Davies, Submission to Murray-Darling Basin Royal Commission, April 2018.

RCE671. Mark Gishen, South Australian Wine Industry, Submission to Murray-Darling Basin Royal Commission, 4 May 2018.

RCE672. Tim Tol, District Council of Loxton Waikerie, Submission to the Murray-Darling Basin Royal Commission, 2018.

RCE673. Barrie MacMillan, Murray Darling Wetlands Working Group Ltd, Submission to Murray-Darling Basin Royal Commission, 30 April 2018.

RCE674.Margaret Gambling, Submission to Murray-Darling Basin Royal Commission, 2018.

RCE675. Brian Bycroft, Submission to Murray-Darling Basin Royal Commission, 2018.

RCE676. Kathy Whitta, Conservation Council SA, Submission to Murray-Darling Basin Royal Commission, 8 May 2018.

RCE677. Mark Hegarty, Blue Zone Group (UVS Pty Ltd), Submission to Murray-Darling Basin Royal Commission, 2018.

RCE678. Ken Jury, Submission to Murray-Darling Basin Royal Commission, 2018.

RCE679.Rob Kerin and Fiona Rasheed, Primary Producers SA, Submission to Murray-Darling Basin Royal Commission, 30 April 2018.

RCE680. Andrew Sniedze, Submission to Murray-Darling Basin Royal Commission, 11 April 2018.

RCE681. Carol Jacobson, Submission to Murray-Darling Basin Royal Commission, 17 April 2018.

RCE682. Kylie Kilroy, Submission to Murray-Darling Basin Royal Commission, 2018.

RCE683. Nick Harvey, Submission to Murray-Darling Basin Royal Commission, 2018.

RCE684. Bill McClumpha, Submission to Murray-Darling Basin Royal Commission, 2018.

RCE685. Carina Dick, Submission to Murray-Darling Basin Royal Commission, 30 April 2018.

RCE686. New South Wales Government, Submission to Murray-Darling Basin Royal Commission, 22 May 2018.

RCE687. Duplicate - see RCE 599.

RCE688. Christopher Rawlins, Submission to Murray-Darling Basin Royal Commission, 24 May 2018.

RCE689. Duplicate - see RCE 346.

RCE690. David Arnold, Bindara on the Darling, Submission to Murray-Darling Basin Royal Commission, 2018.

RCE691. Sharon Starick, South Australian Murray-Darling Basin Natural Resources Management Board, Submission to Murray-Darling Basin Royal Commission, 28 May 2018.

RCE692. Lindsay Leake, Submission to Murray-Darling Basin Royal Commission, 24 May 2018.

RCE693. Yvonne and Don Stewart, Submission to Murray-Darling Basin Royal Commission, 2018.

RCE694. Barbara Webster, Darling River Action Group, Submission to Murray-Darling Basin Royal Commission, 2018.

RCE695. Marie Wecker, Submission to Murray-Darling Basin Royal Commission, 2018.

RCE696. Warren Duncan, Submission to Murray-Darling Basin Royal Commission, 2018.

RCE697. Duplicate - see RCE 358.

RCE698. Ron Perry, Submission to Murray-Darling Basin Royal Commission, 2018.

RCE699. Ian Benning, Birdlife Mildura, Submission to Murray-Darling Basin Royal Commission, 5 June 2018.

RCE700. Gabrielle Coupland, Southern Riverina Irrigators, Submission to Murray-Darling Basin Royal Commission, April 2018.

RCE701. James Wilton, Submission to Murray-Darling Basin Royal Commission, 2018.

RCE702. Jane Redden, Narromine Shire Council, Submission to Murray-Darling Basin Royal Commission, 30 April 2018.

RCE703. Murray McClure, Submission to Murray-Darling Basin Royal Commission, 1 May 2018.

RCE704. Speak Up Campaign Inc, Submission to Murray-Darling Basin Royal Commission, 2018.

RCE705. Paul Porter and Matt Ireson, Wah Wah Alternative Supply Group, Submission to Murray-Darling Basin Royal Commission, 28 June 2018.

RCE706. John Oswald Bennett, Submission to Murray-Darling Basin Royal Commission, 2018.

RCE707. Duplicate - see RCE 406.

RCE708. Duplicate - see RCE 364.

RCE709. Ruth Trigg, Centre for Culture Land and Sea Inc, Submission to Murray-Darling Basin Royal Commission, 6 August 2018.

RCE710. Duplicate - see RCE 12.

RCE711. Saideepa Kumar, Submission to Murray-Darling Basin Royal Commission, 2018.

RCE712. Rebecca Lester and Peter Fairweather, ‘Ecosystem States of the Coorong: An Ecosystem Response Model - Method Development and Sensitivity Analyses’ (CSIRO Water for a Healthy Country National Research Flagship, June 2009)

RCE713.  J D Brookes et al, ‘An Ecosystem Assessment Framework to Guide the Management of the Coorong’ (CSIRO Water for a Healthy Country National Research Flagship, July 2009)
RCE 714 - 764
RCE714. Duplicate - see RCE 519.

RCE715. Duplicate - see RCE 522.

RCE716. Duplicate - see RCE 517.

RCE717. CSIRO, Cotton Breeding and New Cotton Varieties, CSIROpedia <https://csiropedia.csiro.au/cotton-breeding-and-new-cotton-varieties/>.

RCE718. CSIRO, Case Study Cotton Pest Management <https://www.csiro.au/en/Research/AF/Areas/Plant-Science/Cotton/Cotton-pest-management>.

RCE719. CSIRO, Case Study Transforming the Cotton Industry for Competitive Results (25 May 2017) <https://www.csiro.au/en/About/Our-impact/Our-impact-in-action/Agriculture-and-Fisheries/Cotton>. 

RCE720. CSIRO, Cotton Research from Seed to Shirt (6 December 2016) <https://www.csiro.au/en/Research/AF/Areas/Plant-Science/Cotton>.

RCE721. Richard Allen et al, ‘Crop Evapotranspiration – Guidelines for Computing Crop Water Requirements’ (Food and Agriculture Organisation of the United Nations No 56, 1998).

RCE722. Cotton Research and Development Corporation (Cth), 'WATERpak: A Guide for Irrigation Management in Cotton and Grain Farming Systems' (2012) 298-311.

RCE723. Department of Natural Resources, Mines and Energy (Qld) ‘Aboriginal People’s Water Needs in the Queensland Murray-Darling Basin’ (Guide No CS7774, April 2018).

RCE724. Murray-Darling Basin Authority, ‘Our Water, Our Life: An Aboriginal Study in the Northern Basin’ (MDBA Publication No 04/16, October 2016).

RCE725. Monica Morgan, ‘What Has Native Title Done for Me Lately?’ (2009) 93 Australian Law Reform Commission Reform Journal 24.

RCE726. Monica Morgan, Lisa Strelein and Jessica Weir, ‘Indigenous Water Rights Within the Murray Darling Basin’ (2004) 5(29) Indigenous Law Bulletin 17.

RCE727. Monica Morgan, Lisa Strelein and Jessica Weir, ‘Authority, Knowledge and Values: Indigenous Nations Engagement in the Management of Natural Resources in the Murray-Darling Basin’ in Marcia Langton et al (eds), Settling with Indigenous People (Federation Press, 2006) 135.

RCE728. Co-Operative Management Agreement between Yorta Yorta Nation Aboriginal Corporation and the State of Victoria, 10 June 2004.

RCE729. Water Sharing Plan for the Murrumbidgee Regulated River Water Source 2016, 6 July 2018, cl 67.

RCE730. Office of Environment and Heritage (NSW), 'Landowner Agreement Form for the Delivery of Environmental Water to Toogimbie Indigenous Protected Area – 2016/17' (6 March 2017).
 
RCE731. Office of Environment and Heritage (NSW), 'Landowner Agreement Form for the Delivery of Environmental Water to Toogimbie Indigenous Protected Area – 2017/18' (5 October 2017).

RCE732. Local Land Services (NSW), 'Murrumbidgee Cultural Water Plan' (April 2018).

RCE733. 'Report to Murray-Darling Basin Royal Commission: Indigenous Response to the Living Murray Initiative’ (April 2003).

RCE734. Record of Correspondence Between MLDRIN and Basin Jurisdictions Regarding The Implementation of the SDL Adjustment Mechanism, 27 November 2015–8 December 2017.

RCE735.
aLetter from Darren Perry, Murray Lower Darling Rivers Indigenous Nations to David Parker, Basin Officials Committee, 27 November 2015.
b. Letter from Tony Slatyer, Basin Officials Committee to Darren Perry, Murray Lower Darling Rivers Indigenous Nations, 29 January 2016.

RCE736. Letter from Darren Perry, Murray Lower Darling Rivers Indigenous Nations to Tony Slatyer, Sustainable Diversion Limit Adjustment Assessment Committee, 27 November 2015.

RCE737.
a.   Letter from Darren Perry, Murray Lower Darling Rivers Indigenous Nations to Neil Andrew, Murray-Darling Basin Authority, 27 November 2015.
b.  Letter from Russell James, Murray-Darling Basin Authority to Darren Perry, Murray Lower Darling Rivers Indigenous Nations, 25 January 2016.

c. Letter from Darren Perry, Murray Lower Darling Rivers Indigenous Nations to Russell James, Murray-Darling Basin Authority, 23 August 2016.

RCE738.
a.  Letter from Rene Woods, Murray Lower Darling Rivers Indigenous Nations to Niall Blair, Minister for Lands and Water (NSW), 12 April 2017.
b. Letter from Niall Blair, Minister for Primary Industries, Regional Water and Trade and Industry (NSW) to Rene Woods, Murray Lower Darling Rivers Indigenous Nations, 25 July 2017.

RCE739.
a.  Letter from Rene Woods, Murray Lower Darling Rivers Indigenous Nations to Lisa Neville, Minister for Water (Vic), 10 March 2017.
b. Letter from Lisa Neville, Minister for Water (Vic) to Rene Woods, Murray Lower Darling Rivers Indigenous Nations, 18 April 2017.

RCE740. Letter from Ian Hunter, Minister for Water and the River Murray (SA) to Will Mooney, Murray Lower Darling Rivers Indigenous Nations, 9 October 2015.

RCE741. Letter from Will Mooney, Murray Lower Darling River Indigenous Nations, to Peter Kelly, Mallee Catchment Management Authority, 11 January 2016.

RCE742. Letter from Darren Perry, Murray Lower Darling River Indigenous Nations, to Sam Hussey-Smith, Department of Agriculture and Water Resources (Cth), 23 August 2016

RCE743.
R Quentin Grafton, James Horne and Sarah Ann Wheeler, ‘On the Marketisation of Water: Evidence from the Murray-Darling Basin, Australia’ (2016) 30(3) Water Resource Management 913. 

RCE744. Daniel Connell and R Quentin Grafton, ‘Planning for Water Security in the Murray-Darling Basin’ (2008) 3(1) Public Policy 67.

RCE745. Dushmanta Dutta et al, ‘AWRA-R Version 5.0 Technical Report’ (CSIRO Land and Water, October 2015).

RCE746. Jon-Maree Baker et al, Northern NSW Valleys Irrigators, Submission to Murray-Darling Basin Authority, Proposed Amendments to the Basin Plan, 24 February 2017.

REC747. Avril Horne et al, 'Environmental Water Efficiency: Maximising Benefits and Minimising Costs of Environmental Water Use and Management’ (2018) 5(4) WIREs Water 1285.

RCE748. Adam Loch, David Adamson and Thilak Mallawaarachchi 'Role of Hydrology and Economics in Water Management Policy Under Uncertainty' (2014) 518 Journal of Hydrology 5.

RCE749. Jeffery Connor et al, 'Trading Water to Improve Environmental Flow Outcomes' (2013) 49(7) Water Resources Research 4265.

RCE750. David Adamson, 'The Basin Plan, the Buy-Back and Climate Change: Determining an Optimal Water Entitlements (Proceedings of the 2nd Practical Responses to Climate Change, Engineers Australia, 2012).

RCE751. David Adamson, John Quiggin and Daniel Quiggin, 'Water Supply Variability and Sustainable Diversion Limits: Issues to Consider in Developing the Murray-Darling Basin' (UniQuest Project No 17255, October 2011). 

RCE752. John Quiggin et al, 'Climate Change, Uncertainty and Adaptation: The Case of Irrigated Agriculture in the Murray-Darling Basin in Australia' (Climate Change Working Paper: C10#1, University of Queensland).

RCE753. Thilak Mallawaarachchi, et al, 'Economic Analysis of Diversion Options for the Murray-Darling Basin Plan: Returns to Irrigation Under Reduced Water Availability' (Commissioned Study for the Murray-Darling Basin Authority, University of Queensland, June 2010).

RCE754. David Adamson, Thilak Mallawaarachchi and John Quiggin, 'Declining Inflows and More Frequent Droughts in the Murray-Darling Basin: Climate Change, Impacts and Adaptation' (2009) 53 Australian Journal of Agricultural and Resource Economics 345.

RCE755. Adam Loch et al, Submission No 12 to Senate Rural and Regional Affairs and Transport References Committee, Parliament of Australia, Integrity of the Water Market in the Murray-Darling Basin, 2017.

RCE756.
a.  Email from Christopher Kwong, Murray-Darling Basin Royal Commission to John Rolfe, Central Queensland University, 17 July 2018.
b. Email from John Rolfe, Central Queensland University to Christopher
Kwong, Murray-Darling Basin Royal Commission, 17 July 2018.


RCE757. Matthew Toulmin, ‘Basin Plan – GMID Socio-Economic Impact Assessment Report: Final Report’ (RM Consulting Group, Report Version 2.0, 6 September 2016). 

RCE758. Sarah Wheeler et al, Response to RMCG’s Submission to Murray-Darling Basin Royal Commission, 25 July 2018.

RCE759. Steve Hemming and Daryle Rigney, ‘Ngarrindjeri Futures: Negotiating a Future Through Caring for Ruwe/Ruwar (Lands, Waters and All Living Things)’ in Penelope Figgis, James Fitzsimons and Jason Irving (eds) Innovation for 21st Century Conservation (Australian Committee for IUCN, 2012) 186.

RCE760. Steve Hemming, Tom Trevorrow and Matt Rigney, ‘Ngarrindjeri Culture’ in Naomi Goodwin and Sandra Bennett (eds) The Murray Mouth: Exploring the Implications of Closure or Restricted Flow (Department of Water, Land and Biodiversity Conservation (SA), July 2002) 13.

RCE761. Kungun Ngarrindjeri Yunnan Agreement Between the Ngarrindjeri People and the Crown in the Right of the State of South Australia, signed 5 June 2009.

RCE762. Ngarrindjeri Tendi, Ngarrindjeri Heritage Committee and Ngarrindjeri Native Title Management Committee, ‘Ngarrindjeri Nation Yarluwar-Ruwe Plan: Caring for Ngarrindjeri Sea Country and Culture’ (Sea Country Plan, 2006).

RCE763. Natural Resources SA Murray-Darling Basin, ‘What is changing in the Water Allocation Plan for the River Murray Prescribed Watercourse’ (Fact Sheet, South Australian Government, 2018)

RCE764. Duplicate - see RCE 201.
RCE 765 - 815

RCE765: Geoff Wise, Submission to Department of Agriculture and Water Resources (Cth), Independent Review of the Water Act 2007.

RC
E766: New South Wales Irrigators’ Council, Submission No 9 to House of Representatives Standing Committee on Regional Australia, Parliament of Australia, Inquiry into Certain Matters Relating to the Proposed Murray-Darling Basin Plan, 15 June 2012.

RCE767. New South Wales Irrigators’ Council, Submission No 95 to House of Representatives Standing Committee on Regional Australia, Parliament of Australia, Inquiry into the Impact of the Murray-Darling Basin Plan in Regional Australia, 24 November 2010.

RCE768. New South Wales Irrigators’ Council, Submission to Senate, Parliament of Australia, Inquiry on Commonwealth Water Act Amendment Bill, 12 November 2008

RCE769.
Andrew Gregson, New South Wales Irrigators’ Council, Submission to Murray-Darling Basin Authority, Proposed Murray-Darling Basin Plan.

RCE770. Andrew Gregson, New South Wales Irrigators’ Council, Submission to Murray-Darling Basin Authority, Guide to the Draft of the Proposed Murray-Darling Basin Plan.

RCE771. Andrew Gregson, New South Wales Irrigators’ Council, Submission No 7 to Murray-Darling Basin Authority, Sustainable Diversion Limits Issues Paper.

RCE772. New South Wales Irrigators’ Council, Submission No 10 to Senate Rural and Regional Affairs and Transport Committee, Parliament of Australia, Inquiry into Water Management in the Coorong and Lower Lakes.

RCE773. Intergovernmental Panel on Climate Change, ‘Global Warming of 1.5°C’ (Special Report, United Nations Environment Programme and the World Meteorological Organization, October 2018).

RCE774. Andy Reisinger et al, ‘Australasia’ in Intergovernmental Panel on Climate Change, Climate Change 2014: Impacts, Adaptation, and Vulnerability (Intergovernmental Panel on Climate Change Fifth Assessment Report, United Nations Environment Programme and the World Meteorological Organization, 2014).

RCE775. Murray-Darling Basin Authority, Submission to Murray-Darling Basin Royal Commission, September 2018

RCE776.
Commonwealth Environmental Water Holder, Submission to Murray-Darling Basin Royal Commission, 10 October 2018

RCE777. Department of Agriculture and Water Resources (Cth), Submission to Murray-Darling Basin Royal Commission, 10 October 2018

RCE778. Australian Capital Territory Government, Submission to Murray-Darling Basin Royal Commission, October 2018

RCE779. Letter from Peter Mayfield, CSIRO to Bret Walker, Royal Commissioner, 12 October 2018

RCE780.

a. Letter from Bret Walker, Royal Commissioner to Jane Doolan and John Madden, Productivity Commission, 5 October 2018. 

b. Letter from Nina Davidson, Productivity Commission to Joanne Masters, Murray-Darling Basin Royal Commission, 12 October 2018. 

RCE781. Letter from David Wiskar, Department of Natural Resources, Mines and Energy (Qld) to Bret Walker, Royal Commissioner, 11 October 2018

RCE782.
a. Letter from Janine Hebiton, Victorian Government Solicitor’s Office to Joanne Masters, Murray-Darling Basin Royal Commission, 3 October 2018.
b. Victorian Government, ‘Material in response to letter of 7 September 2018 from Murray-Darling Basin Royal Commission’ (3 October 2018)


RCE783. Letters from Neil Andrew, Murray-Darling Basin Authority to Niall Blair, Ian Hunter, Lisa Neville, Anthony Lynham and Mick Gentleman, 26 June 2017

RCE784.
Letter from Bret Walker, Royal Commissioner to Tom Howe, Australian Government Solicitor, 21 May 2018

RCE785. Murray-Darling Basin Authority, ‘Basin Plan Amendments: Northern Basin Review’ (MDBA Publication No 31/16, November 2016)

RCE786. Murray-Darling Basin Authority, ‘Communique: Murray-Darling Basin Ministers Agree Next Steps’ (Communique, 16 June 2017)

RCE787. Murray-Darling Basin Authority, ‘Community Consultation Report: Northern Basin Review’ (MDBA Publication No 41/16, November 2016)

RCE788. Letter from Rhondda Dickson, Murray-Darling Basin Authority to Department of Primary Industries (NSW), 11 August 2015

RCE789.  Senate Rural and Regional Affairs and Transport Committee, Parliament of Australia, Murray-Darling Basin Authority: Answers to Questions on Notice from Additional Estimates Hearing (Question No 158, March 2018).

RCE790. Murray-Darling Basin Authority, ‘Constraints Management Strategy: Annual Progress Report 2016’ (MDBA Publication No 17/18, November 2016)

RCE791. Witness Statement of Tim Stubbs, 23 October 2018.

RCE792. Witness Statement of Terry Hillman, 26 October 2018.

RCE793. Jacobs Group, ‘Due Diligence on Menindee Lakes Business Case’ (Final Report, October 2017)

RCE794

a.  Email from Phillip Glyde, Murray-Darling Basin Authority to Phillip O’Connor, 23 December 2016
b. Email from Phillip Glyde, Murray-Darling Basin Authority to Phillip O’Connor, 23 December 2016
c. Email from Phillip Glyde, Murray-Darling Basin Authority to Phillip O'Connor, 10 May 2016

RCE795. Phillip O’Connor, Brewarrina Shire Council, Submission to Murray-Darling Basin Royal Commission, April 2018. 

RCE796. Glyn Wittwer and Marnie Griffith, ‘Modelling Drought and Recovery in the Southern Murray-Darling Basin’ (2011) 55 Australian Journal of Agricultural and Resource Economics 342.

RCE797. Email from Emma Bradbury, Murray-Darling Association to Sarah Avey, Murray-Darling Basin Royal Commission, 14 September 2018, Attachment: Murray-Darling Association, ‘Socio-Economic Neutrality Definition and Assessment Framework’.

RCE798. Letter from Phillip Glyde, Murray-Darling Basin Authority to Terry Korn, Australian Floodplain Association, 5 July 2017.

RCE799. Catherine Gross et al, ‘Limits to Adaption: Climate Change Adaption in the Coorong, Murray Mouth and Lakes Alexandrina and Albert’ (National Climate Change Adaption Research Facility Publication 06/12, 2012).

RCE800. P C D Milly et al, ‘Stationarity is Dead: Whither Water Management?’ (2008) 319 Science 573.

RCE801. Nick Schofield, ‘Insights from Assessing Risks of Climate Change in the MDB’ (MDBA Risk Assessment Workshop PowerPoint Presentation, 24 February 2011)

RCE802. Letter from Jason Alexandra to Bret Walker, Royal Commissioner.

RCE803. Wendy Proctor et al, ‘Future Research Needs for Climate Change Adaptation in the Murray-Darling Basin’ (CSIRO Report to Murray-Darling Basin Authority, June 2009)

RCE804. Sinclair Knight Merz, ‘Impacts of Climate Change: Project Group Coordinator’ (MDBA Publication No 130/11, 5 November 2010).

RCE805. Murray Lower Darling Indigenous Nations, Response to Questions on Notice from Murray-Darling Basin Royal Commission, 2018.

RCE806. Murray-Darling Basin Authority, ‘Aboriginal information session’ (Media Release, 2017).

RCE807. Ricegrowers’ Association of Australia Inc, ‘Rice Matters’, (Newsletter, September 2017)

RCE808. Email from David Harriss, to Sarah Avey, Murray-Darling Basin Royal Commission, 25 July 2018.

RCE809. John Koehn, ‘Carp (Cyprinus carpio) as a Powerful Invader in Australian Waterways’ (2004) 49 Freshwater Biology 882.

RCE810. N LeRoy Poff et al, ‘The Natural Flow Regime: A Paradigm for River Conservation and Restoration’ (1997) 47(11) BioScience 769.

RCE811. Richard T Kingsford et al, ‘A Ramsar Wetland in Crisis — the Coorong, Lower Lakes and Murray Mouth, Australia’ (2011) 62 Marine and Freshwater Research 255.

RCE812. South Australian Research and Development Institute, ‘Long-Term Intervention Monitoring of the Ecological Responses to Commonwealth Environmental Water Delivered to the Lower Murray River Selected Area in 2016/17’ (a report prepared for the Commonwealth Environmental Water Office, March 2018).

RCE813. Jim Hall and Edoardo Borgomeo, ‘Risk-based Principles for Defining and Managing Water Security’ [2013] Philosophical Transactions of The Royal Society 1.

RCE814. Stephen Schneider et al, ‘Assessing Key Vulnerabilities and the Risk from Climate Change’ in Martin L Parry et al (eds) Climate Change 2007: Impacts, Adaptation and Vulnerability. Contribution of Working Group II to the Fourth Assessment Report of the Intergovernmental Panel on Climate Change (Cambridge University Press, 2007) 779.

RCE815. Pratt Water, The Business of Saving Water: The Report of the Murrumbidgee Valley Water Efficiency Feasibility (Pratt Water, December 2004).

RCE 816 - 866

RCE816: CSIRO, ‘Whole-of-Catchment Water and Salt Balance – Identifying Potential Water Saving and Management Options in the Murrumbidgee Catchment’ (2005).

RCE817: Mac Kirby et al, ‘Water Savings from Delivery Efficiency Improvements’ (CSIRO and Murray-Darling Basin Authority Collaborative Report).

RCE818: Albert van Dijk et al, ‘Risks to the Shared Water Resources of the Murray-Darling Basin’ (MDBC Publication No 22/06, February 2006).

RCE819: Email from David Paton, University of Adelaide to Sarah Avey, Murray-Darling Basin Royal Commission, 6 September 2018, Attachment:Justin Brookes et al, ‘Recommended actions for restoring the ecological character of the South Lagoon of the Coorong’ (Technical Report Series No 18/04, Goyder Institute for Water Research, 2018)

 

RCE820: Email from David Paton, University of Adelaide to Sarah Avey, Murray-Darling Basin Royal Commission, 16 October 2018, Attachment: Letter from David Paton, University of Adelaide to David Speirs, Minister for Environment and Water (SA), 12 October 2018.

RCE821: Duplicate - see RCE 530.

RCE822: Duplicate - see RCE 297.

RCE823: Natural Resources Commission, ‘Scientific Review Lower Lachlan Groundwater Sharing Plan’ (November 2006).

RCE824. Murray-Darling Basin Authority, ‘Water Recovery Factors: NSW Public Consultation' (PowerPoint Presentation, 1 June 2018) .

RCE825. Peter Hyde, ‘Planning Assumptions — Update of NSW Cap Factors’ (All SAP Meeting PowerPoint Presentation, NSW Government, 5-6 June 2016).

RCE826. Emails between Roderick Campbell, The Australia Institute and Mary Colreavy, 27 February–23 March 2018.

RCE827. Ashleigh Jones, ‘Diary Brief’ (Director-General Briefing No WS11/512, NSW Office of Water, 30 June 2011.

RCE828. Daniel Connor and Emily Turner, ‘Public Exhibition of the Draft Water Sharing Plan for the Barwon-Darling Unregulated and Alluvial Water Sources’ (Ministerial Approval No WS11/162).

RCE829. VicSuper, 'VicSuper and Natural Capital' (Information Brochure).

RCE830. Murray-Darling Basin Authority, ‘MDBA Analysis of the Belsar-Yungera Floodplain Management Project Business Case -  Proponent: Victoria’.

RCE831. Murray-Darling Basin Authority, ‘MDBA Analysis of the Burra Creek Floodplain Management Project business case - Proponent: Victoria’.

RCE832. Murray-Darling Basin Authority, ‘MDBA Analysis of the Gunbower National Park Environmental Works Project Business Case -  Proponent: Victoria'.

RCE833. Murray-Darling Basin Authority, ‘MDBA Analysis of the Guttrum and Benwell Forests Environmental Works Project Business Case - Proponent: Victoria’.

RCE834. Murray-Darling Basin Authority, ‘MDBA Analysis of the Hattah Lakes North Floodplain Project Business Case - Proponent: Victoria’.

RCE835. Murray-Darling Basin Authority, ‘MDBA Analysis of the Lindsay Island Floodplain Management Project Business Case -  Proponent: Victoria’.

RCE836. Murray-Darling Basin Authority, ‘MDBA Analysis of the Nyah Floodplain Management Project Business Case - Proponent: Victoria’.

RCE837. Murray-Darling Basin Authority, ‘MDBA Analysis of the Vinifera Floodplain Management Project Business Case -  Proponent: Victoria’.

RCE838. Murray-Darling Basin Authority, ‘MDBA Analysis of the Wallpolla Floodplain Management Project Business Case - Proponent: Victoria’. 

RCE839. Murray-Darling Basin Authority, ‘MDBA Technical Report for Department of the Environment: Engineering Assessment of SDL Adjustment Business Cases submitted by Victoria’.

RCE840. Murray-Darling Basin Authority, ‘MDBA Analysis of the Hume Dam Airspace Management and Pre-releases SDL adjustment proposal - Proponents: Victoria/New South Wales’.

RCE841. Murray-Darling Basin Authority, ‘MDBA Analysis of the Flexible rates of Fall in River Levels Downstream of Hume Dam – The Six Inch Rule Business Case - Proponent: Victoria/NSW’.

RCE842. Murray-Darling Basin Authority, ‘MDBA Analysis of the Operating Rule Change to the use of the Barmah-Millewa Forest Environmental Water Allocation Business Case - Proponent: Victoria/NSW’.

RCE843. Murray-Darling Basin Authority, ‘MDBA Advice on the Riverine Recovery Project Business Case - Proponent: South Australia’.

RCE844. Murray-Darling Basin Authority, ‘MDBA Advice on the South East Flows Restoration Project Business Case - Proponent: South Australia’.

RCE845. Murray-Darling Basin Authority, ‘Phase 2 MDBA Analysis – Existing TLM works and measures: Koondrook- Perricoota’.

RCE846. Murray-Darling Basin Authority, ‘Phase 2 MDBA Analysis – Existing TLM works and measures: Mulcra’.

RCE847. Murray-Darling Basin Authority, ‘Phase 2 MDBA Analysis – Existing TLM works and measures: Lindsay Island'.

RCE848. Murray-Darling Basin Authority, ‘Phase 2 MDBA Analysis – Existing TLM works and measures: Hattah’.
 
RCE849. Murray-Darling Basin Authority, ‘Phase 2 MDBA Analysis – Existing TLM works and measures: Gunbower’.

RCE850. Murray-Darling Basin Authority, ‘Phase 2 MDBA Analysis – Existing TLM works and measures: Chowilla’.

RCE851. Murray-Darling Basin Authority, ‘MDBA Analysis of the Improved Flow Management Works at the Murrumbidgee Rivers – Yanco Creek Offtake Proposal Business Case - Proponent: NSW’.

RCE852. Murray-Darling Basin Authority, ‘MDBA Technical Report for Department of Agriculture and Water Resources: Improved Flow Management Works at the Murrumbidgee Rivers - Yanco Creek Offtake: Engineering Assessment of SDL Adjustment Business Case Submitted by NSW’ (2015).

RCE853. Murray-Darling Basin Authority, ‘MDBA Analysis of the SDL Offsets in the Lower Murray NSW Proposal Business Case - Proponent: NSW’.

RCE854. Murray-Darling Basin Authority, ‘MDBA Technical Report for Department of Agriculture and Water Resources: Lock 8 & 9, Carrs, Capitts and Bunberoo Creeks and Frenchman’s Fish passage: Engineering Assessment of SDL Adjustment Business Case Submitted by NSW’ (2015).

RCE855. Murray-Darling Basin Authority, ‘MDBA Analysis of the Nimmie-Caira Infrastructure Modifications Proposal Business Case - Proponent: NSW’.

RCE856. Murray-Darling Basin Authority, ‘MDBA Analysis: Computer Aided River Management system for the Murrumbidgee River Business Case - Proponent: NSW’.

RCE857. Murray-Darling Basin Authority, ‘MDBA Analysis: Flows for the Future Proposal - Proponent: SA’.

RCE858. Murray-Darling Basin Authority, ‘MDBA Analysis: 2011 Snowy Water Licence Schedule 4 Amendments to River Murray Increased Flows (RMIF) Call Out Provisions Business Case- Proponent: NSW’.

RCE859. Murray-Darling Basin Authority, ‘MDBA Analysis —Murray and Murrumbidgee National Parks Business Case - Proponent: NSW’.

RCE860. Murray-Darling Basin Authority, ‘MDBA Technical Report for Department of Agriculture and Water Resources: Murray and Murrumbidgee Valley National Parks: Engineering Assessment of SDL Adjustment Business Case Submitted by NSW’ (April 2016).

RCE861. Murray-Darling Basin Authority, ‘MDBA Analysis: Modernising Supply Systems for Effluent Creeks - Murrumbidgee River Business Case - Proponent: NSW’.

RCE862. Murray-Darling Basin Authority, ‘MDBA Technical Report for Department of Agriculture and Water Resources : Modernising Supply Systems for Effluent Creeks - Murrumbidgee River’ (April 2016).

RCE863. Murray-Darling Basin Authority, ‘MDBA Analysis: South Australian Riverland Floodplain Integrated Infrastructure Program (SARFIIP) – Pike and Katarapko Floodplain Project Elements Business Case - Proponent: SA’.

RCE864. Murray-Darling Basin Authority, ‘MDBA Analysis: Menindee Lakes Water Saving Project Phase 2 Business Case - Proponent: NSW’.

RCE865. Murray-Darling Basin Authority, ‘Evaluation of SDL Adjustment Measures for Phase 2 (Business Cases) – Provisional MDBA Assessment – Title of Measure: Yarrawonga to Wakool Reach Constraints Concept Proposal - Proponent: New South Wales’.

RCE866. Murray-Darling Basin Authority, ‘MDBA Provisional Assessment of the Murrumbidgee Key Focus Area - Proponent New South Wales’.
RCE 867 - 904
RCE867. Murray-Darling Basin Authority, ‘MDBA Assessment of the Hume to Yarrawonga Key Focus Area - Proponent: Victoria & New South Wales’.

RCE868. Murray-Darling Basin Authority, ‘Evaluation of SDL Adjustment Measure for Phase 2 (Business Cases) – MDBA Assessment – Title of Measure: River Murray in South Australia Constraints Measure Business Case - Proponent: South Australia’.
 
RCE869. Duplicate – see RCE 531.

RCE870. Department of Industry (NSW), ‘Water Reform Action Plan – Community Consultation What We Heard’ (INT18/88559, June 2018).

RCE871. Department of Industry (NSW), ‘Draft NSW Metering Framework’ (Fact Sheet PUB18/326, June 2018).

RCE872. Department of Industry (NSW), ‘Implementing the NSW Floodplain Harvesting Policy: Consultation Outcomes’ (Fact Sheet PUB18/347, June 2018).

RCE873. Department of Industry (NSW), ‘NSW Healthy Floodplains Project: Taking a Proactive Approach to Floodplain Management in NSW’ (Fact Sheet INT18/87364, June 2018).

RCE874. Department of Industry (NSW), ‘Implementing the NSW Floodplain Harvesting Policy: Outcomes from Community Engagement’ (INT18/85817, June 2018).

RCE875. Department of Industry (NSW), ‘Amendments to the Water Sharing Plan for the Barwon-Darling Unregulated and Alluvial Water Sources 2012 Relating to Daily Extraction Limits and Individual Annual Take Limits’ (Fact Sheet PUB18/299, June 2018)

RCE876. Department of Industry (NSW), ‘Amendments to Northern Murray-Darling Basin Unregulated Water Sharing Plans to Facilitate Active Management to Share Flows’ (PUB18/298, June 2018).

RCE877. Department of Industry (NSW), ‘Implementing the NSW Floodplain Harvesting Policy – Consultation Paper’ (PUB18/162, March 2018).

RCE878. Department of Industry (NSW), ‘NSW Floodplain Harvesting– Implementing the Policy’ (Fact Sheet PUB18/180, March 2018).

RCE879. Department of Industry (NSW), ‘Licensing of Floodplain Extractions’ (PUB03/2018, March 2018).

RCE880. Department of Industry (NSW), ‘Flood Plain Harvesting - Status Update’ (February 2018).

RCE881. Department of Industry (NSW), ‘Floodplain Management under the Water Management Act 2000 – A Guide to the Changes’ (PUB05/2018, May 2018).

RCE882. Department of Industry (NSW), ‘An Overview of the Floodplain Management Plans under the Water Management Act 2000’ (PUB05/2018, May 2018).

RCE883. Department of Primary Industries (NSW), ‘Sustaining the Basin – Healthy Floodplains – NSW Floodplain Harvesting Policy’ (INT17/16203, April 2017).

RCE884. Department of Primary Industries (NSW), ‘NSW Floodplain Harvesting Policy' (May 2013).

RCE885. Department of Industry (NSW), ‘NSW Floodplain Harvesting Policy’ (PUB18/393, September 2018).

RCE886. Department of Industry (NSW), ‘Rural Floodplain Management Plans – Technical Manual for Plans Developed under the Water Management Act 2000 - Version 2.0’ (INT18/78444, June 2018).

RCE887. Department of Industry (NSW), 'Changes Made to the NSW Floodplain Harvesting Policy in 2018' (Floodplain Harvesting Fact Sheet INT18/161865, October 2018).

RCE888. Department of Industry (NSW), ‘NSW Healthy Floodplains Project- Taking a Proactive Approach to Floodplain Management in NSW' (NSW Healthy Floodplains Fact Sheet INT18/147308, October 2018).

RCE889. Natural Resources Access Regulator (NSW), 'Application Form - Amend Flood Work Approval' (INT18/136826, September 2018).

RCE890. Department of Industry (NSW), 'NSW Water Reform Action Plan - Better Management of Environmental Water’ (Consultation Paper PUB18/172, March 2018).

RCE891. Department of Industry (NSW), 'NSW Water Reform Action Plan - Transparency Measures' (Consultation Paper PUB18/164, March 2018).

RCE892. Department of Industry (NSW), 'About the Water Reform Action Plan’ (Fact Sheet PUB18/176, March 2018).

RCE893. Water Management Amendment Bill 2018 (NSW) (Public Consultation Draft, 9 March 2018).

RCE894. Letter from Kathleen Hainsworth, NSW Crown Solictor's Office to Joanne Masters, Murray-Darling Basin Royal Commission, 13 August 2018.

RCE895. Basin Officials Committee, ‘Improved River Regulation of the River Murray’ (Agenda Item 3, BOC 50, June 2017)

RCE896. Basin Officials Committee, ‘Update on the Improved Regulation of the River Murray project’ (Agenda Item 4, BOC 47, May 2017).

RCE897. Murray-Darling Basin Authority, ‘Assessment of Menindee Water Saving’ (Technical Report No 2017/12, October 2017).

RCE898. Letter from Kathleen Hainsworth, NSW Crown Solicitor's Office to Joanne Masters, Murray-Darling Basin Royal Commission, 23 October 2018.

RCE899. Letter from Dan Jordan, Department for Environment and Water (SA) to Bret Walker, Royal Commissioner, 26 October 2018.

RCE900. Letter from Bret Walker, Royal Commissioner to Alison O’Brien, Victorian Government Solicitor’s Office, 12 October 2018.

RCE901. Letter from Barnaby Joyce, Minister for Agriculture and Water (Cth) to Ian Hunter, Minister for Sustainability, Environment and Conservation (SA), 17 November 2016.

RCE902. Lisa Neville, Minister for Water (Vic), 'New Criteria to Benefit Basin Communities', (Media Release, 15 October 2018).

RCE903. John Briscoe, Harvard University, Submission No 2 to Senate Standing Committee on Legal and Constitutional Affairs, Parliament of Australia, Inquiry on the Provisions of the Water Act 2007, 24 February 2011.

RCE904. Letter from Dan Jordan, Department for Environment and Water (SA) to Joanne Masters, Murray-Darling Basin Royal Commission, 23 October 2018.
RCE 905 - 955
RCE905: Conference of the Parties, Convention on Wetlands of International Importance Especially as Waterfowl Habitat, Third Meeting of the Conference of the Contracting Parties, Held in Regina, Canada from 27 May to 5 June 1987, Recommendation 3.3: Wise Use of Wetlands.

RCE906: Conference of the Parties, Convention on Wetlands of International Importance Especially as Waterfowl Habitat, Ninth Meeting of the Conference of the Parties to the Convention on Wetlands, Held in Ramsar, Iran from 8 – 15 November 2005, RES/IX.1 Annex A, A Conceptual Framework for the Wise Use of Wetlands and the Maintenance of their Ecological Character.

RCE907: Conference of the Parties, Report of the Fifth Meeting of the Conference of the Parties to the United Nations Convention on Biological Diversity Held in Nairobi, Kenya from 15–26 May 2000, Decision 6: Ecosystem Approach (annex III).

RCE908: Evidence to Senate Standing Committee on Legal and Constitutional Affairs, Water Act 2007, Parliament of Australia, Canberra, 18 May 2011, 61 (Rob Freeman, Chief Executive Murray-Darling Basin Authority).

RCE909: Murray-Darling Basin Authority, ‘Basin Plan Adaptive Management Framework: 2017 Basin Plan Evaluation’ (MDBA Publication No 07/18, December 2017).

RCE910: Murray-Darling Basin Authority, ‘Preliminary Overview of Constraints to Environmental Water Delivery in the Murray-Darling Basin: Technical Support Document’ (MDBA Publication No 14/13, July 2013).

RCE911: Letter from Craig Knowles, Murray-Darling Basin Authority to Tony Burke, Murray-Darling Basin Ministerial Council, 28 May 2012.

RCE912: Murray-Darling Basin Ministerial Council, ‘Notice by Murray-Darling Basin Ministerial Council under Section 43A(4) of the Water Act 2007’ (9 July 2012).

RCE913: New South Wales Government, ‘Notice by the NSW Government under Section 43A(4) of the Water Act 2007’.

RCE914: South Australian Government, ‘Murray-Darling Basin Ministerial Council: Notice of Disagreement by the South Australian Murray-Darling Basin Ministerial Council Member under Section 43A of the Water Act 2007’ (9 July 2012).

RCE915: ‘California’s Fourth Climate Change Assessment: California’s Changing Climate 2018 — A Summary of Key Finding from California’s Fourth Climate Change Assessment’ (Report, California Governor’s Office of Planning and Research, California Energy Commission and California Natural Resources Agency, 2018).

RCE916: Murray-Darling Basin Authority, ‘Hydrologic Assessment of Flow Changes in the Northern Basin’ (MDBA Publication 35/18, October 2018).

RCE917: Ed Fessey, Submission to Murray-Darling Basin Royal Commission, 2018.

RCE918: Murray-Darling Basin Authority, ‘Handbook for Practitioners: Water Resource Plan Requirements’ (MDBA Publication No 20/13, October 2013).

RCE919: Letter from Fred Hooper, Northern Basin Aboriginal Nations to Murray Darling Basin Authority Board, 27 April 2016.

RCE920: Murray-Darling Basin Authority ‘Approach to Monitoring and Compliance: Water Resource Plans’ (MDBA Publication No 01/17, March 2017).

RCE921: Wentworth Group of Concerned Scientists, ‘Proposed Criteria for Accrediting Water Resource Plans under the Murray-Darling Basin Plan’ (Paper, 13 November 2018).

RCE922: South Australian Murray-Darling Basin Natural Resources Management Board, ‘Amending the Water Allocation Plan for the River Murray Prescribed Watercourse: Environmental Land Management Allocations’ (Fact Sheet 9, 5 December 2014).

RCE923: South Australian Murray-Darling Basin Natural Resources Management Board, ‘Draft: Water Allocation Plan for the River Murray Prescribed Watercourse’ (13 July 2018).

RCE924: South Australian Murray-Darling Basin Natural Resources Management Board, ‘Water Allocation Plan for the River Murray Prescribed Watercourse’ (3 October 2017).

RCE925: South Australian Murray-Darling Basin Natural Resources Management Board, ‘Water Allocation Plan for the River Murray Prescribed Watercourse’ (15 July 2009, as amended January 2011).

RCE926: River Murray Catchment Water Management Board, ‘Water Allocation Plan for the River Murray Prescribed Watercourse’ (12 January 2004).

RCE927: River Murray Catchment Water Management Board, ‘Water Allocation Plan for the River Murray Prescribed Watercourse’ (1 July 2002).

RCE928: Rhondda Dickson, ‘The Murray-Darling Basin Plan: Adaptive Management in a Changing Climate’ (Speech Delivered at the Practical Responses to Climate Change Conference, Canberra, 2 May 2012) <https://www.mdba.gov.au/media/mr/mdba-chief-executives-speech-practical-responses-climate-change-conference>.

RCE929: Murray-Darling Basin Authority, ‘River Management — Challenges and Opportunities’ (25 November 2011).

RCE930: House of Representatives Standing Committee on Regional Australia, Parliament of Australia, Of Drought and Flooding Rains: Inquiry into the Impact of the Guide to the Murray-Darling Basin Plan (2011).

RCE931: CSIRO, ‘CSIRO Submission on the Notice by Murray-Darling Basin Ministerial Council under Section 43A(4) of the Water Act 2007’. 

RCE932: EDO NSW, ‘Murray-Darling Basin Ministerial Council s43A Notice’ (23 July 2012).

RCE933: Murray-Darling Basin Authority, Assessing Environmental Water Requirements for the Basin’s Rivers (3 December 2012) <www.mdba.gov.au/publications/mdba-reports/assessing-environmental-water-requirements-basins-rivers>.

RCE934: Murray-Darling Basin Authority, ‘Communique’ (6 June 2017).

RCE935: Department of Environment, Water and Natural Resources (SA), ‘South Australia’s Prerequisite Policy Measures Implementation Plan for the River Murray in South Australia’ (August 2016).

RCE936: Murray-Darling Basin Ministerial Council, ‘Water Ministers Agree Basin Plan Package’ (Communique, 22 April 2016).

RCE937: Basin Officials Committee, ‘Basin Officials Committee Advice to the Murray-Darling Basin Authority on the Sustainable Diversion Limit Adjustment Determination’.

RCE938: Federal Register of Legislation, Australian Government, Basin Plan Amendment (SDL Adjustments) Instrument 2017 <https://www.legislation.gov.au/Details/F2018L00040>. 

RCE939: Murray-Darling Basin Authority, ‘MDBA Stands by Rigorous, Peer-Reviewed Process for Amendment’ (Media Statement, 3 May 2018).

RCE940: Riverina and Murray Joint Organisation, Submission No DR101 to Productivity Commission, Murray Darling Basin Plan: Five-Year Assessment, 10 October 2018.

RCE941: Murray-Darling Basin Authority, ‘Guide to the Proposed Basin Plan: Volume 2 — Technical Background’ (MDBA Publication No 61/10, 2010) Appendix A.

RCE942: Murray-Darling Basin Authority, ‘Guide to the Proposed Basin Plan: Volume 2 — Technical Background’ (MDBA Publication No 61/10, 2010) Appendix B.

RCE943: Murray-Darling Basin Authority, ‘Guide to the Proposed Basin Plan: Volume 2 — Technical Background’ (MDBA Publication No 61/10, 2010) Appendix C.

RCE944: Murray-Darling Basin Authority, ‘Stakeholder Engagement Strategy: Involving Australia in the Development of the Murray-Darling Basin Plan’ (MDBA Publication No 46/09, November 2009).

RCE945: Murray-Darling Basin Authority, ‘Basin Plan Guide Released for Public Discussion’ (Media Release, 8 October 2010).

RCE946: Tony Burke, Minister for Sustainability, Environment, Water, Population and Communities (Cth), ‘Ministerial Statement: Murray Darling Basin Reform — Interpretation of the Water Act 2007’ (Media Statement, 25 October 2010).

RCE947: Murray-Darling Basin Authority, ‘MDBA Welcomes Minister’s Statement’ (Media Release, 26 October 2010).

RCE948: Murray-Darling Basin Authority, ‘Murray-Darling Basin Water Ministers Meet in Albury’ (Communique, 17 December 2010).

RCE949: Murray-Darling Basin Authority, ‘MDBA Chair Mr Craig Knowles’ Speech to the Sustaining Rural Communities Conference (Narrabri)’ (Media Release, 6 April 2011).

RCE950: CSIRO, ‘CSIRO Technical Comments on the Guide to the Proposed Basin Plan’ (17 December 2010).

RCE951: Jeff Connor (ed), ‘A Compilation of Reports Informing a Socioeconomic Assessment of the Guide to the Proposed Basin Plan’ (Technical Report Series No 11/4, Goyder Institute for Water Research, 2011).

RCE952: E Maltby and D Black, ‘Synthesis Review of the Science Underpinning the Environmental Water Requirements of the Coorong, Lower Lakes, and Murray Mouth’ (Technical Report Series No 11/5, Goyder Institute for Water Research, 2011).

RCE953:  Murray-Darling Basin Authority, ‘Plain English Summary of the Proposed Basin Plan — Including Explanatory Notes’ (MDBA Publication No 173/11, November 2011).

RCE954: Murray-Darling Basin Authority, Sustainable Diversion Limit Adjustment Projects <https://www.mdba.gov.au/basin-plan-roll-out/sustainable-diversion-limits/sdl-adjustment-proposals-state-projects>.

RCE955: Natural Resources South East (SA), South East Flows Restoration Project <https://www.naturalresources.sa.gov.au/southeast/projects/se-flows>.
RCE 956 - 1005
RCE956: NSW Government, ‘Menindee Lakes Water Savings Project Notification’ (1 December 2017).

RCE957: Duplicate. See RCE 958.

RCE958: Murray-Darling Basin Authority, ‘Enhanced Environmental Water Delivery: A Business Case for the Sustainable Diversion Limit Adjustment Mechanism’ (1 December 2017).

RCE959: Murray-Darling Basin Authority, ‘Summary of Public Feedback: Sustainable Diversion Limit Adjustment Mechanism — Draft Determination’ (MDBA Publication No 45/17, 8 December 2017).

RCE960: Murray-Darling Basin Authority, ‘Basin Environmental Watering Priorities: Overview and Technical Summaries’ (MDBA Publication No 18/18, June 2018).

RCE961: Murray-Darling Basin Authority, ‘Review of the Northern Rivers Connectivity Event during the Temporary Water Restrictions’ (MDBA Publication No 32/18, October 2018).

RCE962: Ben Fordham, ‘“Change the Legislation”: Barnaby Joyce Hits Back at Drought Action Criticism’, 2GB (online), 29 August 2018 <https://www.2gb.com/change-the-legislation-barnaby-joyce-hits-back-at-drought-action-criticism/>.

RCE963: Murray-Darling Basin Authority, ‘Fair Water Management Depends on Secure Property Rights’, (Media Release, 26 September 2018) <https://www.mdba.gov.au/media/mr/fair-water-management-depends-secure-property-rights>.

RCE964: Department of the Environment and Energy (Cth), Local Engagement <http://www.environment.gov.au/water/cewo/local-engagement>.

RCE965: Murray-Darling Basin Authority, ‘Native Vegetation: 2017 Basin Plan Evaluation’ (MDBA Publication No 43/17, December 2017).

RCE966: Murray-Darling Basin Authority, ‘Native Fish: 2017 Basin Plan Evaluation’ (MDBA Publication No 42/17, December 2017).

RCE967: Murray-Darling Basin Authority, ‘River Flow and Connectivity: 2017 Basin Plan Evaluation’ (MDBA Publication No 03/18, February 2018).

RCE968: Murray-Darling Basin Authority, ‘Basin Plan Adaptive Management Framework: 2017 Basin Plan Evaluation’ (MDBA Publication No 07/18, December 2017).

RCE969: Jake Sturmer and Nick Harmsen, ‘Barnaby Joyce Looks to Revive Health Audit of Murray-Darling Basin’ ABC News (online), 12 October 2015 <https://www.abc.net.au/news/2015-10-11/joyce-looks-to-revive-murray-health-audit/6842442>.

RCE970: South Australian Government, ‘South Australian Government Science Analysis of Additional Basin Plan Modelling’.

RCE971: Evidence to Senate Rural and Regional Affairs and Transport Legislation Committee, Parliament of Australia, Canberra, 26 October 2018.

RCE972: Murray-Darling Basin Authority, ‘Treatment of Climate Change in the Basin Plan’ (Agenda Item 7.5 of Meeting 30, 5 April 2011).

RCE973: CSIRO, Submission to Murray-Darling Basin Royal Commission, October 2018.

RCE974: Will Steffen et al, ‘Deluge and Drought: Australia’s Water Security in a Changing Climate’ (Report, Climate Council, 2018).

RCE975: Department of Industry (NSW), ‘People Over Politics to Save Basin Rivers’ (Media Release, 13 February 2018)  <https://www.industry.nsw.gov.au/water/news/people-over-politics-to-save-basin-rivers>.

RCE976: Department of Industry (NSW), ‘Labor and the Greens Fail Basin Rivers and People’ (Media Release, 14 February 2018) <https://www.industry.nsw.gov.au/water/news/labor-and-the-greens-fail-basin-rivers-and-people>.

RCE977: Lisa Neville, Minister for Water (Vic), ‘Response to Northern Basin Review Disallowance’ (Media Release, 6 February 2018) <https://www.premier.vic.gov.au/wp-content/uploads/2018/02/180206-Response-To-Northern-Basin-Review-Disallowance.pdf>.

RCE978: Lisa Neville, Minister for Water (Vic), ‘Victoria Fights for Crucial Basin Plan Projects’ (Media Release, 13 February 2018) <https://www.premier.vic.gov.au/wp-content/uploads/2018/02/180213-Victoria-Fights-For-Crucial-Basin-Plan-Projects.pdf>.

RCE979: Brett Worthington and Caitlyn Gribbin, ‘Senate Rejects Murray-Darling Basin Plan Changes as Labor Backs Greens, NSW Government Prepares to Withdraw’, ABC Rural (online), 14 February 2018 <https://www.abc.net.au/news/2018-02-14/senate-rejects-murray-darling-basin-changes/9447876>.

RCE980: Commonwealth, Questions Without Notice: Water, House of Representatives, 20 October 2018, 942 (Tony Burke).

RCE981: Commonwealth, Parliamentary Debates, House of Representatives, 26 October 2010, 1551 (Christopher Pyne, Tony Burke).

RCE982: ABC Radio National, ‘Water Minister Defends His Position’, PM, 26 October 2010 (Tony Burke) <http://www.abc.net.au/pm/content/2010/s3048906.htm>.

RCE983: Lenore Taylor, ‘Basin Plan Gets Bogged Down in Legal Wrangling’, The Sydney Morning Herald (online), 27 October 2010 <https://www.smh.com.au/environment/sustainability/basin-plan-gets-bogged-down-in-legal-wrangling-20101026-172eq.html>.

RCE984: Lauren Wilson, ‘Lower Water Cuts on Table’, The Australian (online), 27 October 2010 <https://www.theaustralian.com.au/national-affairs/lower-water-cuts-on-table/news-story/b34b679313a0575c86833a5f4200c80d>.

RCE985: Tony Burke, Minister for Sustainability, Environment, Water, Population and Communities, ‘New Chair for Murray-Darling Basin Authority’, (Media Release, 28 January 2011) <http://www.environment.gov.au/minister/burke/2011/mr20110128.html>.

RCE986: ABC Radio National, ‘Former Labor MP New Murray Darling Basin Authority Boss’, PM, 28 January 2011 (Craig Knowles) <http://www.abc.net.au/pm/content/2011/s3124477.htm>.

RCE987: Senate Legal and Constitutional Affairs References Committee, Parliament of Australia, Attorney-General’s Department: Answer to Question on Notice from Additional Estimates Hearing (Question No 60, 22 February 2011) and attachments.

RCE988: Senate Legal and Constitutional Affairs References Committee, Parliament of Australia, Response to Questions on Notice Provided by the Murray-Darling Basin Authority, 2 June 2011 (Robert Freeman, Chief Executive, Murray-Darling Basin Authority).

RCE989: Commonwealth, Parliamentary Debates, Senate, 10 May 2012, Documents, Tabling, Procedural Text, ‘Australian Government Response to the Senate Legal and Constitutional Affairs References Committee Report: A Balancing Act: Provisions of the Water Act 2007’, 3235–9.

RCE990: Peter Hannam, ‘“Trust Us”: Changes to Murray-Darling Plan May Face Legal Challenges’ The Sydney Morning Herald (online), 2 May 2018 <https://www.smh.com.au/environment/conservation/trust-us-changes-to-murray-darling-plan-may-face-legal-challenges-20180502-p4zcvt.html>.

RCE991: South Australian Government, Submission to Murray-Darling Basin Authority, Draft Basin Plan, 16 April 2012.

RCE992: Tony Burke, Minister for Sustainability, Environment, Water, Population and Communities (Cth), ‘Government Working Closely with the States on the Basin Plan’ (Media Release, 28 August 2012) <https://web.archive.org/web/20120901021243/http://www.environment.gov.au:80/minister/burke/2012/mr20120828.html>.

RCE993: Letter from Tony Burke, Minister for Sustainability, Environment, Water, Population and Communities (Cth) to Craig Knowles, Murray-Darling Basin Authority, 1 November 2012.

RCE994: Letter from Tony Burke, Minister for Sustainability, Environment, Water, Population and Communities (Cth) to Craig Knowles, Murray-Darling Basin Authority, 20 November 2012.

RCE995: Murray-Darling Basin Authority, Mythbusting <http://webarchive.nla.gov.au/gov/20130409043324/http://www.mdba.gov.au/draft-basin-plan/mythbusting>.

RCE996: Murray-Darling Basin Authority, ‘MDBA Chair Craig Knowles’ Speech to the Farm Writers’ Association of NSW’ (Media Release, 27 April 2012) <https://www.mdba.gov.au/media/mr/mdba-chair-craig-knowles-speech-farm-writers-association-nsw>.

RCE997: CSIRO, Submission to Murray-Darling Basin Authority, Draft Basin Plan, 16 April 2012.

RCE998: Malcolm Turnbull, Federal Member for Wentworth and Shadow Minister for Communications and Broadband, ‘The Water Act and the Basin Plan’ (9 December 2010 <https://web.archive.org/web/20110626235353/https:/www.malcolmturnbull.com.au/blogs/the-water-act-and-the-basin-plan>.

RCE999: Letter from Peter Mayfield, CSIRO to Bret Walker, Royal Commissioner, 5 November 2018.

RCE1000: Letter from Doug Humphries, Law Society of New South Wales to Carolyn Lee, Murray-Darling Basin Royal Commission, 31 May 2018.

RCE1001: Email from Paul Kildea to the Murray-Darling Basin Royal Commission, 24 April 2018.

RCE1002: Email from Anita Foerster to Carolyn Lee, Murray-Darling Basin Royal Commission, 29 May 2018.

RCE1003: Email from Stephanie Booker, EDO ACT to Carolyn Lee, Murray-Darling Basin Royal Commission, 22 May 2018.

RCE1004: Email from Revel Pointon, EDO Qld to Carolyn Lee, Murray-Darling Basin Royal Commission, 24 May 2018.

RCE1005: Evidence to Senate Standing Committee on Legal and Constitutional Affairs, Parliament of Australia, Canberra, 18 May 2011, 57 (Robert Freeman, Chief Executive, Murray-Darling Basin Authority).

RCE 1006 - 1056
RCE1006: Senate Legal and Constitutional Affairs References Committee, Parliament of Australia, Response to Questions on Notice Provided by the Murray-Darling Basin Authority, 2 June 2011 (Robert Freeman, Chief Executive, Murray-Darling Basin Authority).

RCE1007: Duplicate - See RCE 971.

RCE1008: Department of the Environment and Energy (Cth), Delivery Partners <https://www.environment.gov.au/water/cewo/delivery-partners>.

RCE1009: Murray-Darling Basin Authority, ‘Murray-Darling Basin Authority Annual Report 2017–18’ (2018).

RCE1010: Ben Gawne et al, ‘2015–16 Basin-Scale Evaluation of Commonwealth Environmental Water — Synthesis Report: Final Report Prepared for the Commonwealth Environmental Water Office by the Murray-Darling Freshwater Research Centre’ (MDFRC Publication No 141/2017, October 2017).

RCE1011: Natural Resources SA Murray-Darling Basin, Monitoring South Australian River Murray Wetlands and Floodplains <https://www.naturalresources.sa.gov.au/samurraydarlingbasin/projects/all-projects-map/wetland-monitoring>.

RCE1012: Wentworth Group of Concerned Scientists, ‘Review of Water Reform in the Murray-Darling Basin’ (November 2017) Appendix 2.

RCE1013: Murray-Darling Basin Ministerial Council, ‘Legislative and Governance Forum on the Murray-Darling Basin No. 2: Murray-Darling Basin Water Ministers Meet in Canberra’ (Communique, 29 June 2012).

RCE1014: Q Wang, Glen Walker and Avril Horne, ‘Potential Impacts of Groundwater Sustainable Diversion Limits and Irrigation Efficiency Projects on River Flow Volume Under the Murray-Darling Basin Plan’ (Review, Melbourne School of Engineering Water, Agriculture and Environment Program, October 2018).

RCE1015: Department of Agriculture and Water Resources (Cth), Murray-Darling Basin Water Infrastructure Program (29 November 2018) <http://www.agriculture.gov.au/water/mdb/programs/basin-wide/mdbwi-program>.

RCE1016: ‘SA Water Minister Ian Hunter Admits to “Strong Language” at Basin Meeting but Refuses to Step Down’ ABC News (online), 21 November 2016 <https://www.abc.net.au/news/2016-11-21/sa-water-minister-ian-hunter-refuses-to-step-down/8041292>.

RCE1017: Natalie Kotsios and Tony Shepherd, ‘SA Water Minister Ian Hunter in Foul-Mouthed Tirade at Fellow Politicians Including Acting Prime Minister Barnaby Joyce’ The Advertiser (online), 18 November 2016 <https://www.adelaidenow.com.au/news/south-australia/sa-water-minister-ian-hunter-in-foulmouthed-tirade-at-fellow-politicians-including-acting-prime-minister-barnaby-joyce/news-story/e4903e3e674779d422a439d435fc2c1e>.

RCE1018: Murray-Darling Basin Ministerial Council, ‘Setting the Cap: Report of the Independent Audit Group’ (November 1996).

RCE1019: Murray-Darling Basin Commission, ‘Review of Cap Implementation 2006/07: Report of the Independent Audit Group’ (MDBC Publication No 27-08, March 2008).

RCE1020: Murray-Darling Basin Authority, ‘Review of Cap Implementation 2010–11: Report of the Independent Audit Group’ (MDBA Publication No 216/11, October 2011).

RCE1021: Murray-Darling Basin Authority, ‘Review of Cap Implementation 2007–08: Report of the Independent Audit Group’ (MDBA Publication No 08/09, March 2009).

RCE1022: Murray-Darling Basin Ministerial Council, ‘Review of Cap Implementation 1997/98: Report of the Independent Audit Group: Including Responses by the Four State Governments’ (November 1998).

RCE1023: Council of Australian Governments, ‘A National Action Plan for Salinity and Water Quality’ (3 November 2000).

RCE1024: Murray-Darling Basin Ministerial Council, ‘Integrated Catchment Management in the Murray-Darling Basin 2001–2010: Delivering a Sustainable Future’ (June 2001).

RCE1025: Murray-Darling Basin Commission, ‘Annual Report 2003–2004’ (MDBC Publication No 68/04, 2004).

RCE1026: Will Steffen, ‘Thirsty Country: Climate Change and Drought in Australia’ (Climate Council of Australia, 2015).

RCE1027: John Howard, ‘Transcript of the Prime Minister the Hon John Howard MP: Address to the National Press Club’ (Speech delivered at Parliament House, 25 January 2007) <https://parlinfo.aph.gov.au/parlInfo/download/media/pressrel/K81M6/upload_binary/k81m68.pdf;fileType=application%2Fpdf#search=%22media/pressrel/K81M6%22>.

RCE1028: Boyd Blackwell, Jim McFarlane and Nam Hoang, ‘Final Review Report for the Murray Darling Basin Authority (MDBA): An Independent Review of the Southern Basin Community Modelling Approach’ (2018).

RCE1029: New South Wales Government, ‘Advice to Water Management Committees: No. 3 Floodplain Harvesting’ <http://www.water.nsw.gov.au/__data/assets/pdf_file/0004/548338/policy_advice_3-floodplainharvesting.pdf>.

RCE1030: Murray-Darling Basin Commission, ‘The Cap: Providing Security for Water Users and Sustainable Rivers’ (Brochure, 2004).

RCE1031: Murray-Darling Basin Authority, ‘Diversion Formula Register for the Murray-Darling Basin’ (Version 5, Approved by MDBA Decision D11/32219, 8 November 2011).

RCE1032: Murray-Darling Basin Authority, ‘Murray-Darling Basin Authority Annual Report 2010–11’ (MDBA Publication No 218/11, 2011).

RCE1033: Murray-Darling Basin Authority, ‘Water Audit Monitoring Report 2011–12: Report of the Murray-Darling Basin Authority on the Cap on Diversions’ (MDBA Publication No 20/16, August 2016).

RCE1034: Department of Industry (NSW), ‘Floodplain Harvesting Fact Sheet: Monitoring and Auditing Approach’ (October 2018).

RCE1035: Department of Industry (NSW), ‘Floodplain Harvesting in Regulated Rivers: Accounting for Floodplain Harvesting in NSW’s Water Sharing Plans’ (October 2018).

RCE1036: Department of Industry (NSW), ‘NSW Healthy Floodplains: Modelling and Data Collection for Implementing Floodplain Harvesting’ (October 2018).

RCE1037: Murray-Darling Basin Commission, ‘Review of the Operation of the Cap: Overview Report of the Murray-Darling Basin Commission’ (Final Report to Murray-Darling Basin Ministerial Council, August 2000).

RCE1038: Anne Davies, ‘NSW Minister Altered Barwon-Darling Water-Sharing Plan to Favour Irrigators’ The Guardian (online), 8 February 2018 <https://www.theguardian.com/australia-news/2018/feb/08/nsw-minister-altered-barwon-darling-water-sharing-plan-to-favour-irrigators>.

RCE1039: Department of Primary Industries, Office of Water (NSW), ‘Water Sharing Plan for the Barwon-Darling Unregulated and Alluvial Water Sources: Background Document’ (September 2012).

RCE1040: Commonwealth Environmental Water Office, ‘Northern Connectivity Event Update 8’ (20 July 2018).

RCE1041: Murray-Darling Basin Authority, ‘Meeting 29 — 1 March 2011 — Adelaide: Minutes’.

RCE1042: Murray-Darling Basin Authority, ‘Environmentally Sustainable Level of Take’ (Agenda Item 7.1 of Meeting 29, 1 March 2011).

RCE1043: Murray-Darling Basin Authority, ‘Meeting 30a — 11 April 2011 — Teleconference: Minutes’.

RCE1044: Murray-Darling Basin Authority, ‘Meeting 33 — 5 July 2011 — Sydney — 6 July 2011 — Teleconference: Minutes’.

RCE1045: Murray-Darling Basin Authority, ‘Meeting 36 — 26 October 2011 — Canberra: Minutes’.

RCE1046: New South Wales, South Australia and Victoria, Royal Commission on the River Murray, Report of the Commissioners (1902).

RCE1047: Murray-Darling Basin Authority, ‘Towards a Healthy, Working Murray-Darling Basin: Basin Plan Annual Report 2014–15’ (MDBA Publication No 23/15, 2015).

RCE1048: US Global Change Research Program, ‘Climate Science Special Report: Fourth National Climate Assessment — Volume I’ (Report, 2017).

RCE1049: Mark Ogge, Bill Browne and Travis Hughes, ‘HeatWatch: Extreme Heat in Western Sydney’ (Report, The Australia Institute, November 2018).

RCE1050: Rebekha Sharkie, House of Representatives Question: Answer to Question on Notice Provided by David Littleproud (Question No 1127, 22 November 2018).

RCE1051: Michael Coggan, ‘Ringbalin Shares Indigenous Culture and Healing Environment Message’, ABC News (online), 3 April 2017 <https://www.abc.net.au/news/2017-04-03/ringbalin-murray-river-ceremony/8411430>.

RCE1052: Witness Statement of Monica Morgan, 2018.

RCE1053: Sofie Wainwright, ‘Traditional Owners Call for Water Rights One Year on from Barkandji Native Title Determination’ ABC News (Online), 21 June 2016 <http://www.abc.net.au/news/2016-06-21/calls-for-indigenous-water-rights-a-year-on-from-native-title/7530236>.

RCE1054: Badger Bates, ‘When They Take the Water from a Barkandji Person, They Take Our Blood’ The Guardian (online), 26 July 2017 <https://www.theguardian.com/commentisfree/2017/jul/26/when-they-take-the-water-from-a-barkandji-person-they-take-our-blood>.

RCE1055: Australian Law Reform Commission, Review of the Native Title Act 1993, Issues Paper No 45 (2014).

RCE1056: Australian Law Reform Commission, Connection to Country: Review of the Native Title Act 1993 (Cth), Report No 126 (2015).

RCE 1057 - 1113
RCE1057: Murray Lower Darling Rivers Indigenous Nations, Response to Questions on Notice from Murray-Darling Basin Royal Commission Public Hearings, 2018.

RCE1058: Department of Agriculture and Water Resources (Cth), ‘Report of the Independent Review of the Water Act 2007: Australian Government Response’ (3 December 2015).

RCE1059: National Cultural Flows Research Project, ‘Cultural Flows: Field Work Results & Findings Report’ (2017).

RCE1060: National Cultural Flows Research Project, ‘Cultural Flows: Gooraman Swamp Cultural Flow Monitoring & Evaluation Plan’ (2017).

RCE1061: Department for Environment and Water (SA), ‘South Australian Murray Region Water Resource Plan: Provided for Accreditation Pursuant to Section 63 of the Commonwealth’s Water Act 2007’ (2018).

RCE1062: Department of Industry (NSW), ‘Healthy Floodplains Project: Draft Floodplain Harvesting Monitoring and Auditing Strategy, for Consultation’ (INT18/176327, November 2018).

RCE1063: Emails between Maryanne Slattery, The Australia Institute and Peter Hyde, Department of Primary Industries (NSW), 22–28 November 2018.

RCE1064: Department of Industry (NSW), ‘Gwydir Surface Water Resource Plan: Baseline Diversion Limit Model for the Gwydir Regulated River System (Update)’ (INT18/166004, November 2018).

RCE1065: Murray-Darling Basin Commission, ‘Water Audit Monitoring Report 1996/97’ (October 1998).

RCE1066: Murray-Darling Basin Commission, ‘Murray-Darling Basin Groundwater: A Resource for the Future’ (1999).

RCE1067: David Ife and Kathryn Skelt, ‘Murray-Darling Basin Groundwater Status: Summary Report 1990–2000’ (MDBC Publication No 32/04, 2004).

RCE1068: National Water Commission, ‘National Water Initiative: First Biennial Assessment of Progress in Implementation’ (August 2007).

RCE1069: National Water Commission, ‘Australian Water Reform 2009: Second Biennial Assessment of Progress in Implementation of the National Water Initiative’ (September 2009).

RCE1070: S Parsons, R Evans and M Hoban, ‘Surface-Groundwater Connectivity Assessment: A Report to the Australian Government from the CSIRO Murray-Darling Basin Sustainable Yields Project’ (CSIRO, September 2008).

RCE1071: D Rassam, G Walker and B Barnett, ‘Recommendations for Modelling Surface-Groundwater Interactions Based on Lessons Learnt from the Murray-Darling Basin Sustainable Yields Project: A report to the Australian Government from the CSIRO Murray-Darling Basin Sustainable Yields Project’ (CSIRO, September 2008).

RCE1072: S Richardson et al, ‘Groundwater Management Unit Prioritisation and Assessment Ranking: A Report to the Australian Government from the CSIRO Murray-Darling Basin Sustainable Yields Project’ (CSIRO, September 2008).

RCE1073: National Water Commission, ‘The National Water Initiative — Securing Australia’s Water Future: 2011 Assessment’ (September 2011).

RCE1074: National Water Commission, ‘Integrating Groundwater and Surface Water Management in Australia’ (April 2014).

RCE1075: Murray-Darling Basin Authority, ‘Addendum to the Proposed Groundwater Baseline and Sustainable Diversion Limits: Methods Report’ (MDBA Publication No 62/12, July 2012).

RCE1076: Murray-Darling Basin Authority, ‘Proposed Groundwater Amendments to the Basin Plan – Additional Information’ (MDBA Publication No 37/16, November 2016).

RCE1077: Murray-Darling Basin Authority, ‘Basin Plan Science Strengthened through Independent Review’ (Media Release, 15 October 2018) <https://www.mdba.gov.au/media/mr/basin-plan-science-strengthened-through-independent-review>.

RCE1078: Murray-Darling Basin Authority, ‘Progress of Water Recovery Towards “Bridging the Gap” to SDLs by 30 June 2019 as at 30 September 2018’ (2018).

RCE1079: Australian Government, ‘Australian Government Response to the Senate Rural and Regional Affairs and Transport References Committee Report: Management of the Murray-Darling Basin System: Second Interim Report: The Basin Plan’ (January 2013).

RCE1080: National Water Commission, ‘Annual Report 2009–10’ (2010) <http://webarchive.nla.gov.au/gov/20160615075458/http://archive.nwc.gov.au/library/annual-reports/annual-report-2009-10/section-1>.

RCE1081: Senate Rural and Regional Affairs and Transport References Committee, Parliament of Australia, Integrity of the Water Market in the Murray-Darling Basin (2018).

RCE1082: ABC News, ‘Pumped: Who's Benefitting from the Billions Spent on the Murray-Darling?’ Four Corners, 24 July 2017 (Sarah Ferguson).

RCE1083: Department of Agriculture and Water Resources (Cth), ‘National Framework for Non-Urban Water Metering: Policy Paper’ (2009).

RCE1084: Ombudsman New South Wales, ‘Investigation into Water Compliance and Enforcement 2007–17: A Special Report to Parliament under Section 31 of the Ombudsman Act 1974’ (Report, November 2017).

RCE1085: ‘Memorandum of Understanding between the Murray-Darling Basin Authority (MDBA) and the NSW Natural Resources Access Regulator (NRAR)’, 20 February 2018.

RCE1086: Murray-Darling Basin Authority, ‘Compliance Improvements on Track’ (Media Release, 14 December 2017) <https://www.mdba.gov.au/media/mr/compliance-improvements-track>.

RCE1087: Murray-Darling Basin Authority, ‘Independent Assurance Committee to Strengthen Basin-Wide Compliance’ (Media Release, 12 February 2018) <https://www.mdba.gov.au/media/mr/independent-assurance-committee-strengthen-basin-wide-compliance>.

RCE1088: Independent Assurance Committee, ‘Report to the Authority on the First Meeting of the Independent Assurance Committee’ (16 March 2018).

RCE1089: Independent Assurance Committee, ‘Report to the Authority from the Second Meeting of the Independent Assurance Committee’ (18 April 2018).

RCE1090: Independent Assurance Committee, ‘Report to the Authority from the Fourth Meeting of the Independent Assurance Committee’ (20 August 2018).

RCE1091: Murray-Darling Basin Authority, ‘Register of Compliance Matters — Open Cases as at 26 October 2018’ <https://www.mdba.gov.au/sites/default/files/pubs/Allegations-non-compliance-October-2018.pdf>.

RCE1092: Murray-Darling Basin Authority, ‘The MDBA Protocol for Handling Allegations of Non-Compliance’ (The Murray-Darling Basin Water Compliance Review — Part A).

RCE1093: Murray-Darling Basin Authority, ‘Annual Report on Compliance Activities for [State]’ (Guidelines for Annual Reporting on Water Compliance Activities) <https://www.mdba.gov.au/sites/default/files/pubs/Guidelines-annual-reporting-compliance%20activities.PDF>.

RCE1094: Murray-Darling Basin Authority, ‘2017−18 Annual Report on Compliance Activities for the Murray-Darling Basin Authority’ (29 May 2018).

RCE1095: Murray-Darling Basin Ministerial Council, ‘Murray-Darling Basin Compliance Compact’ (June 2018).

RCE1096: Murray-Darling Basin Authority, ‘Compliance and Enforcement Policy 2018–21’ (MDBA Publication No 15/18, June 2018).

RCE1097: Murray-Darling Basin Authority, ‘Compliance Priorities 2018–2019’ <https://www.mdba.gov.au/sites/default/files/pubs/compliance-priorities_0.pdf>.

RCE1098: Murray-Darling Basin Authority, ‘Sustainable Diversion Limit Reporting and Compliance Framework’ (MDBA Publication No 37/18, November 2018).

RCE1099: Department of Industry (NSW), ‘Water Reform Action Plan: Quarter 3 Progress Report (July–September 2018)’ (Report, October 2018).

RCE1100: Department of Industry (NSW), ‘Over 100 Actions Taken by New Water Regulator’ (Media Release, 19 September 2018) <https://www.industry.nsw.gov.au/media/releases/2018/over-100-actions-taken-by-new-water-regulator>.

RCE1101: Department of Industry (NSW), ‘Charges Laid by New Water Regulator’ (Media Release, 24 August 2018) <https://www.industry.nsw.gov.au/media/releases/2018/charges-laid-by-new-water-regulator>.

RCE1102: Anne Davies, ‘Prominent Barwon-Darling Irrigator Pleads Guilty to Illegal Pumping’, The Guardian (online), 26 November 2018 <https://www.theguardian.com/australia-news/2018/nov/26/prominent-barwon-darling-irrigator-pleads-guilty-to-illegal-pumping>.

RCE1103: Department of Industry (NSW), ‘NSW Non-Urban Water Metering Policy’ (November 2018).

RCE1104: Department of Industry (NSW), ‘NSW Non-Urban Water Metering Framework: Fact Sheet — Overview of New Requirements’ (November 2018).

RCE1105: Murray-Darling Basin Authority, ‘Basin Plan: Water Resources Requirements: Position Statement 14A: Aboriginal Values and Uses’ (MDBA Reference D15/29345, 14 August 2015).

RCE1106: Marsden Jacob Associates, 'Benefit-Cost Analysis: Potential Use of the Adelaide Desalination Plant to Offset Reductions in Irrigators' Allocations in Dry Periods (Final Report, June 2016).

RCE1107: Murray-Darling Basin Ministerial Council, 'Murray-Darling Basin Ministers Meet in Melbourne' (Communique, 14 December 2018).

RCE1108: Department of Agriculture and Water Resources (Cth), 'Efficiency Measures - Agreed Criteria'.

RCE1109: Seftons Rural and Regional Agribusiness and Communications Consultants, 'Murray-Darling Basin Water Infrastructure Program Consultation for Additional Criteria' (Independent Consultation Report, 5 December 2018).

RCE1110: Murray-Darling Basin Authority, 'Water Resource Plan - December 2018 Quarterly Report' (MDBA Publication No 40/18, December 2018).

RCE1111: CSIRO and Bureau of Meteorology, 'State of the Climate 2018' (Report, 2018).

RCE1112: Murray-Darling Basin Authority, 'Murray-Darling Basin Compliance Compact Interim Assurance Report 2018' (MDBA Publication No 44/18, December 2018).

RCE1113: Murray-Darling Basin Compliance Compact, 12 December 2018.